Laserfiche WebLink
. <br /> CITY OF ORONO SEPTIC SYSTEM PERiI�IIT APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, Ni�t 55323 <br /> JOB STTE ADDRESS: ,� .� o� ��a��uJ��� � �_: ����� <br /> Occupa.ncy Type: Residential � Commercial Other <br /> Permit Type: Ne�v or Repiacement Sy�stem, $100.00 � <br /> Repair Existing System, $ 50.00 <br /> (Tanks or Drainfield) <br /> 0.50 State surcharge added to above fees <br /> *See fee schedule for non-residential permit fees <br /> Owner's Name: �;R�'n n^ R,i��{. �r`,`� S _ PhoneNumber: 3� a2���5�42 � <br /> Nlailing Address: (�o lLo� w City: � ��-: �p� S�3? � <br /> Contractor's Name: ' � Co�s . M�(� PhoneNumber: �� t? --,�.�'� -�3 7 7 <br /> Niailing Address: r u � I Cv �� �� 3S (�t, City: �d�� Zip: S�3 z/ <br /> DO NOT I�iAII� PAI'I�IENT K'ITH THIS APPLICATION <br /> GEYERAL INSTRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the Ciry <br /> Offices; however, permits will no[ be mailed out. The permit must be picked up in <br /> person at the City Offices and work must not begin unless the permit card is on the job <br /> site. <br /> 2. Permits will be issued only to contractors holding a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Desi?n <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet si�ned by the Ciry Inspector. <br /> 4. The followi.n� inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required <br /> after rough-up but prior to sand placement (sand will be jar tested for silt content), <br /> and a�ain durin� pressure distribution pipin; installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holding MPCA Installer Cercificate shall be present durin� inspections: A 24-' <br /> hour notice is required for all inspections. <br /> �'1�-�-\ <br /> � <br /> � <br />