My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolutions #3652/3653
Orono
>
Property Files
>
Street Address
>
S
>
Scotch Pine Lane
>
Scotch Pine Lane -VACATION
>
Paperwork re: vacation
>
Resolutions #3652/3653
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 7:19:52 AM
Creation date
8/21/2018 1:47:24 PM
Metadata
Fields
ProcessedPID
True
Tags
No PIN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-_�. _ _ . . ' , r , <br /> 7 O� <br /> O O <br /> � � <br /> CITY of ORONU <br /> �,�� �G'ti RESOLUTION O�F T�H5C��ITY COUNCIL <br /> 9kESH�S�`' NO. <br /> Vt'I�REAS, Lots 1-4 and Scotch Pine Lane will be replatted into three building <br /> lots and a private driveway outlot, with lot areas as follows: <br /> Proposed Lot 1 = 1.13 acres (Marfield) <br /> Proposed Lot 2 = 0.85 acres (Hill) <br /> Proposed Lot 3 = 1.34 acres (±0.96 acres dry) (Toles) <br /> Outlot A = 0.05 acres; and <br /> VVHEREAS, as a result of the replat, each of the three proposed lots increases in <br /> acreage gained from the vacation of Scotch Pine Lane, and in t�ie case of progosed T ot 2, also <br /> resulting from the addition of area incorporated within the existing Lot 2. Each of proposed Lots <br /> 1, 2 and 3 will, however, remain at lot areas less than the required two acre minimum for the LR- <br /> lA Zoning District, requiring a lot area variance; and <br /> WHEREAS, each of proposed Lots 1, 2 and 3 are lakeshore lots but lack the <br /> required 200' lot width at the shoreline and at the 75' lakeshore setback Iine as required in the LR- <br /> lA district, requiring lot width variances for each of Lots 1, 2 and 3; and <br /> «'I�REAS, proposed Lots 2 and 3 both abut North Shore Drive, a platted Counry <br /> road. Proposed Lot 1 as a result of the replat will no longer abut a public roadway, but will gain <br /> access via a shared driveway servin� proposed Lots 1 and 2 within proposed Outlot A. By <br /> definition, proposed Lot 1 is a "back lot" per Municipal Subdivision Code Section 11.03, <br /> Subdivision 2. Per Section 11.31, Subdivision 5 (C-2), proposed Lot 1 is required to meet 150%a <br /> of the two acre zoning district lot area requirement; is required to meet the 200' lot width <br /> requirement at the shoreline, at the lakeshore setback line, and at the street yard setback line; is <br /> subject to a street ��ard or front yard depth of 1509� of the 50' front yard requirement of the LR- <br /> lA district; and is subject to a side yard depth of 1�0% of the 30' LR-lA side yard requirement; <br /> and <br /> «'HEREAS, as a result of the replat, the M�eld property (proposed Lot 1) <br /> becomes a bacl: lot v��ith 4�' required side setbacks rather than the 30' side setbacks normally <br /> required in the LR-1A district, making more of Marfield's residence structure non-conforming <br /> to the side setback requirements. Similarly, the Hill property (proposed Lot 2) becomes a front <br /> lot subject to a �0' side street setback alon� Outlot A, and 30' side setback along the common <br /> boundary line �;zth proposed Lot 1. The replat results in revised setback requirements <br /> impacting proposed Lots 1, 2 and 3, v��hich must be taken into account in future improvements <br /> to those properties; <br /> � Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.