My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01462 - new structure
Orono
>
Property Files
>
Street Address
>
S
>
Sandstone Lane
>
2496 Sandstone Lane - 33-118-23-11-0023
>
Permits/Inspections
>
2014-01462 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:43:06 PM
Creation date
8/20/2018 3:10:12 PM
Metadata
Fields
Template:
x Address Old
House Number
2496
Street Name
Sandstone
Street Type
Lane
Address
2496 Sandstone Lane
Document Type
Permits/Inspections
PIN
3311823110023
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a ,1� - ; <br /> MINNEHAHA CREEK WATERSHED DISTRICT <br /> QUALITY OF WATER QUALITY OF LIFE <br /> Pursuant to Minnesota Statutes Chapter 103D, and on the basis of statements <br /> and information contained in the perm�application, correspondence, plans, <br /> The Minr�ehaha Creek maps, and all other supporting data submitted by the appUcant, and made a part <br /> hereof by reference, PERMISSION IS HEREBY GRANTED to the applicant <br /> watershed�istrict is named below for use and development of land in the Minnehaha Creek <br /> committed to a leadership Watel'shed District. <br /> rote in protecting, <br /> Issued to• Stonebrook Development LLC Permit No: 15-001 <br /> improving and managing <br /> the surface waters and Location• 2496-2498 Sandstone Ln Orono <br /> affiliated groundwater purpose• Erosion Control-Multi-Familv Residential <br /> resouaes within the Date of Issuance: 1/26/2015 Date of Ex iration: 1/26/2016 <br /> District,induding their <br /> By Order of the Board of Managers <br /> relationships to the � <br /> ecosystems of which , � � �� <br /> Tom Dietrich <br /> they are an integral part. District Technician <br /> We achieve our mission This permit is not transferable without District approval, and is valid to the date of <br /> through regulation, expiration. No activity is authorized beyond the expiration date, If the permittee <br /> requires more time to complete the project, an application for renewal of the <br /> capital projects, permit must be received by the District at least 30 days before expiration. <br /> eduw�on,cooperative The applicant is responsible for compliance with all District Rules and for the <br /> endeavors,and other action of their representatives, contractors, and employees. <br /> programs based on Stipulations: Project to be completed as described in plans submitted to the <br /> MCWD office on January 13'", 2015 according to the provisions of <br /> sound science, this permlt. <br /> innovative thinking,an • Properly install and maintain all required erosion control <br /> measures until the disturbed areas are re-stabilized <br /> informed and engaged • When the site is re-stabilized and the MCWD staff has <br /> performed a final inspection, all silt fences must be removed <br /> constituency,and the <br /> cost effective use of (Statement conceming fees for inspections, violations, etc... on following page) <br /> pubtic funds. <br /> 15320 Minneb�nla Boulevard,Minnetonka,MN 55345•Offioe:(952)471-0590�Fax:(952)471-0682•www minnehahacreek.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.