Laserfiche WebLink
�EC-28-2005 09�07 ULTEIG MPLS 7635711168 P.02 <br /> - ' �engineers <br /> 6e!fha Job dpa►t�ht <br /> 520I E F3u�er Road,Suite 308 <br /> MinneapoGs,MN 5542110'17 <br /> Phone:763.571,2500 <br /> Fax�763.571.II6B <br /> INSPECTION MEMORANDUM <br /> TO: Superior Masonry and I hereby certify thaE this plan„ epeci[ication or <br /> Concrete,InC. report was prepared by ane or under t�ny direct <br /> Mure3'�(Jlfert5 supervision and that I am a duly Iicensed <br /> 7526 4�*Ave. profe9sional engineer under the Iaws o�the State <br /> Lino Lakes,MN 55014 of Mimne6ota. <br /> ,� <br /> DATE: December 28,2005 <br /> Rob ey A.Evans <br /> FROM: Isaac Odland Date: t.�"2 —e3" <br /> Mianesota Registeation No.43119 <br /> RE: 6665 Sandstone Lane <br /> Orono,MN <br /> Proj.No.: 205.1478 <br /> �saac Odland of Ulteig Engineers performed a generat inspection of the footing construction at <br /> the above structure on December 23,2005. The following items were noted at the uupection. <br /> 1. At the time of the inspection, it was approximately 35 degrees and sunny. b & M <br /> Cancrete was on site to perfarm the work. <br /> 2. The foundation consists of a strip footing 2 feet wide and 10 inches deep. <br /> 3. The reinforcing steel for the foundation consisted of (2) no. 4 bars centered in the <br /> footing. This construction is ixt accordance with the 2005 Master Cast In Place <br /> Foundation WaI1 Drawin�s prepazed by Ulteig Engineers, Dated 1-1-05, standard <br /> I industry practice, and the requirements of the code, <br /> 4. The information, observations, and opyn.ions stated in this report are based on an <br /> inspection made by Isaac Od]and. The inspection consisted o� a visuaI wallc-th�rough <br /> observ�ing exposed elements. <br /> Minneapolis, MN•Detroit Lakes, MN•Fargo, ND�Bismarck. ND•Sioux Falls, SD <br /> I www.ulteig.com <br />