Laserfiche WebLink
Builder Acknowledgement Form <br /> C� 5� ���b�- ���- � zo�c� - o�� <br /> Builder <br /> Permit Conditions Initials <br /> Prior to the start of framing, a foundation as-built survey must be submitte <br /> and approved by the City or a stop work order will be issued. <br /> Schedule a minimum of one hour for the framing inspection. <br /> Erosion control mechanisms must be installed and inspected by the City <br /> proper to any land disturbing activities. The contractor must provide a <br /> minimum of a 24 hour notice prior to inspection. <br /> Erosion control shall be installed and maintained throughout the entire <br /> project and must remain until vegetation has been established. <br /> rote se now fencin or me <br /> a . <br /> N un sewer within 20 feet o . <br /> Prior to the issuance of a Certificate of Occupancy an as-built survey-aw�- N� _ S�N r'� <br /> ' ss-i#-ap�+iEa#�le must be submitted and approved. <br /> In the event of winter or other unfavorable weather conditions (which <br /> prevent the completion of the exterior improvements and/or as-built ��_��� <br /> survey) a Temporary Certificate of Occupancy (TCO) may be necessary. A <br /> TCO requires a $10,000 escrow. <br /> Advisory Comments <br /> Any changes to the exterior/landscaping improvements, i.e. patios,grading, <br /> sidewalks, retaining walls, etc. not currently shown on the approved survey / <br /> and landscaping plan will require a separate Zoning Permit application to be <br /> submitted and approved prior to the work commencing. <br /> Any retaining walls that over 4-feet in height or tiered walls not separated <br /> by twice of the height of the lower wall require engineered plans and a <br /> building permit to be submitted and approved prior to construction. <br /> w:\applications,license or permit applications\builder acknowledgement form.docx <br />