My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01007 - addn/remodel/repair
Orono
>
Property Files
>
Street Address
>
S
>
Sandstone Circle
>
657 Sandstone Circle - 33-118-23-11-0033
>
Permits/Inspections
>
2012-01007 - addn/remodel/repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:43:35 PM
Creation date
8/7/2018 11:02:14 AM
Metadata
Fields
Template:
x Address Old
House Number
657
Street Name
Sandstone
Street Type
Circle
Address
657 Sandstone Circle
Document Type
Permits/Inspections
PIN
3311823110033
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> . , <br /> � <br /> � � <br /> September 28, 2012 E n c o m � S S <br /> P <br /> engineering �o�sultants <br /> Ms. Kate Grutzmacher forensi� analy�is <br /> Gittleman Management Corporation � � ' <br /> 1801 American Boulevard East, Suite 21 / �j �'� /�� <br /> Bloomington, MN 55425 <br /> �� / � <br /> Re: StoneBay Townhomes ��/,��� ��''� �?,��//7C:.vi� <br /> StoneBay Drive ° . <br /> ,.�. <br /> Orono, MN 55144 <br /> Enc. Project#: 12-5038 <br /> pear Kate: <br /> 1.0 INTRODUCTION <br /> 1.1 At your request, an investigation of the supporting deck columns at three units <br /> (657, 659, and 661) at StoneBay Townhomes has been conducted. <br /> 1.2 Movement of deck support columns was reported. <br /> 2.0 OBSERVATIONS <br /> 2.1 The columns supporting the rear elevation decks above garage entry doors <br /> were found to be significantly out of alignment and appear to not align properly <br /> with the Sonotube concrete footings installed below grade. <br /> 2.2 This condition was confirmed by excavating at three locations. The below <br /> grade footing for the decks do not align with the above grade decorative stone <br /> bases, which consist of concrete and stone veneer, with a hollow fiberglass <br /> composite square post set atop of the stone veneer base and supporting the <br /> deck header. See attached photos 1, 2. <br /> 2.3 Encompass also observed no mechanicat connections between the fiberglass <br /> composite posts and deck header, and in one location the fiberglass post <br /> appeared to be deteriorating. See attached photo 3. <br /> 2.4 At the time of our visit to the site, two columns were found to be significantly <br /> out of plumb and in an unsafe condition. These columns were temporarily <br /> shored by others. <br />
The URL can be used to link to this page
Your browser does not support the video tag.