Laserfiche WebLink
�. ] all penetrations between conditioned and unconditioned spaces made prior to framing inspection are sealed * <br /> . Interior Air Barrier <br /> [ ] a11 fire stops are air sealed <br /> [ ] pipes, ducts, wires, equipment and flues and chimneys through the interior air barrier are sealed <br /> [ ] a sealed continuous interiar air barrier is installed on the warm side of the building envelope at ceilings,wa11s, <br /> and floor rim joist areas * <br /> [ ] air barrier behind tub and shower is sealed and protected <br /> [ ] recessed light fi�ctures are sealed <br /> Envelope Insulation <br /> [ ] basement insulation R-5 minimum <br /> [ ] wind wash barrier on wall separating house and garage is sealed <br /> [ ] loose fill insulation is prevented from entering the eaves <br /> [ ] insulation on skylight shafts and walls e�osed in attics is supported on the unconditioned side <br /> Attic Insudation <br /> [ ] attic access panel insulated to R-38 for ceiling panel and R-19 for wall panel <br /> [ ] attic card attached to framing near access opening <br /> [ ] notification of attic R-value and date of installation posted near building permit inspection card <br /> This is a summary only. Other requirements may apply. See the Minnesota Energy Code. Questions? Call the <br /> Department of Public Service Information Center at 651-296-5175 or 1-800-657-3710. <br />