My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-00196 - new structure
Orono
>
Property Files
>
Street Address
>
S
>
Sandhill Drive
>
585 Sandhill Drive - 33-118-23-24-0014
>
Permits/Inspections
>
2018-00196 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:29 PM
Creation date
8/6/2018 9:04:47 AM
Metadata
Fields
Template:
x Address Old
House Number
585
Street Name
Sandhill
Street Type
Drive
Address
585 Sandhill Drive
Document Type
Permits/Inspections
PIN
3311823240014
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Builder Acknowledgement Form <br /> Permit #2018-00196 / 585 Sandhill Drive <br /> Builder Representative Name: ��P�vis� � v�r��"� <br /> Permit Conditions: Initials <br /> **NOTE CHANGE** Before scheduling an exterior insulation and/or drain tile inspection,a <br /> foundation as-built survey must be submitted and approved by the City or a Stop Work order /j� <br /> will be issued. L�� <br /> Schedule a minimum of one hour for the framin�inspection. � <br /> Erosion control mechanisms must be installed and inspected by the City prior to any land <br /> disturbing activities. The contractor must provide a minimum of a 24 hour notice prior to /`iJ� <br /> inspection. �L <br /> Erosion control shall be installed and maintained throughout the entire project and must � <br /> remain until vegetation has been established. <br /> Separate utility permits required for sewer and water connection. � <br /> The curb stop should be protected from damage during construction. � <br /> Prior to the issuance of a Certificate of Occupancy an as-built survey and hardcover calculations � <br /> must be submitted and approved. <br /> In the event of winter or other extended unfavorable weather conditions(which prevent the <br /> completion of the exterior improvements and/or as-built survey)a Temporary Certificate of <br /> Occupancy(TCO) may be necessary. A TCO requires a$10,000 escrow. <br /> Advisory Comments <br /> Any changes to the exterior/landscaping improvements, i.e. patios,grading, sidewalks, retaining <br /> walls, etc. not currently shown on the approved survey and landscaping plan will require a <br /> separate Zoning Permit application to be submitted and approved prior to the work <br /> commencing. <br /> Any retaining walls that are over 4-feet in height or tiered walls not separated by twice of the <br /> height of the lower wall require engineered plans and a building permit to be submitted and <br /> approved rp ior to construction. <br /> w:\street files\sandhill drive\585\builder acknowledgement form 2018-00196.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.