Laserfiche WebLink
Section B <br /> Ventilation Method <br /> (Choose either balanced or exhaust onry) <br /> � Balanced,HRV(Heat Recovery Ventilator)or ERV(Energy Recovery Exhaust only <br /> Ventilator)—dm of unit in low must nat exceed continuous Continuous fan reting in cfm <br /> .o <br /> Low dm: o� High cfm: �C Q Continuous fan roting i�cfm(capacity must not exceed <br /> �� vo continuous ventilation rotiog by more than 100%) <br /> Directions-Choose the method of ventilation,bolanced or exhaus[onty.Ba/anced ventilation systems are typically HRV or ERV's. <br /> Enfer the low a�high cJm amounts.Low cfm oir flow must be equa/to or greater than the required continuous ventilotion mte and <br /> less than 100%greater than the continuous rate.�For instance,if the low cfm is 40 cfm,the ventilation fan must not exceed 80 cfm.J <br /> Automatic controls may allow the use of a lorger fan that is operated a percentoge of each hour. <br /> Section C <br /> Ventilation Fan Schedule <br /> Descri tion Location Continuous tntermittent <br /> Direttions-The ventilation Jan schedule should destri6e whot the fan is jor,the location,cfm,ond whether it is used jor mntinuous <br /> or intermittent ventilation.The fan thot is chose jor contlnuous ventilation must be equo/to or greater than the!ow cfm air ro[ing <br /> and less than 100A6 greater thon the mntlnuous rote.(For insronce,if the low cfm is 40 cJm,the continuous ventilation jon must not <br /> exceed BO cJm.J Automatic controls may allow the use ojo larger fon that is operated a percentoge of each hour. <br /> Section D <br /> Ventilation Controls <br /> Describe o eration and control of the continuous and interm'Rtent ventilation) <br /> ERV has wall coMrol set to 50°k=88 CFM <br /> ERV has wali control set to 90%=158 CFM <br /> Directions-Describe the operatlon of the veMilation rystem.There should be adequate detall for plan reviewen ond inspedors to verify design and <br /> instollation compliance.Related trades also need adequate detail for p/acement of conbols and proper operotion of the 6uilding ventilotion.If exhaust fans <br /> are used for building venUlation,describe the operotion and location ojony contro/s,indicaton and legends.If on ERV or HRV is ro be insbolled,describe how <br /> it will be installed.If it will be conrreded ond inteijaced with the air handling equipmen4 please describe such mnnections as detalled in the manufattures' <br /> installotion instructions.lf the ins[allotion instructions require or recommend the equipment to be interlocked with the air handling equipment for proper <br /> opemtion,such interconnectlon shall be mode and described. <br />