Laserfiche WebLink
, , <br /> Christine Mattson <br /> From: Robert Bean <bobbe@bolton-menk.com> <br /> Sent: Tuesday, September 19, 2017 3:15 PM <br /> To: Christine Mattson <br /> Cc: Adam Edwards <br /> Subject: 2017-01067 - 570 Sandhill Drive <br /> Christine, <br /> I have completed review of the information submitted for 570 Sandhill Drive in Orono Preserve,and following are my <br /> comments for your consideration: <br /> 1. The existing grades in the rear yard are too high and will impede runoff flowing from the adjacent lot to the <br /> north. During construction,the rear yard should be re-graded to be within acceptable tolerance of proposed <br /> .�''1 grades indicated on the approved development plans. <br /> 2. Perimeter erosion control measures should be installed by the Contractor and inspected by the City prior to any <br /> aother work. Contractor should provide a minimum 24 hour notice prior to inspection. <br /> 3. Contractor must exercise care during construction to not block traffic on Sandhill Drive.Clear drive lanes must <br /> be maintained at all times. <br /> 4. A permit from Minnehaha Creek Watershed District should be required for their Erosion Control Rule. A copy of <br /> the permit should be provided prior to any land disturbance. <br /> If you have any questions or comments, please contact me to discuss. <br /> Thanks, <br /> Robert E Bean Jr. P.E. <br /> Water Resources Project Engineer <br /> Bolton&Menk, Inc. <br /> 2638 Shadow Lane <br /> Suite 200 <br /> Chaska, MN 55318-1172 <br /> Phone:952-448-8838 ext.2892 <br /> Mobile:612-756-3184 <br /> Bolton-Menk.com <br /> This email has been scanned by the Symantec Email Security.cloud service. <br /> For more information please visit http://www.symanteccloud.com <br /> i <br />