Laserfiche WebLink
Builder Acknowledgement Form <br /> Permit #2017-00961 / 540 Sandhill Drive <br /> Builder Representative Name: ��tta <br /> �w..Vv�1�.S <br /> Permit Conditions: Initials <br /> **NOTE CHANGE** Before scheduling an exterior insulation and/or drain tile inspection,a <br /> foundation as-built survey must be submitted and approved by the City or a Stop Work order � /� , <br /> will be issued. �� <br /> Schedule a minimum of one hour for the framing inspection. � <br /> Erosion control mechanisms must be installed and inspected by the City prior to any land <br /> disturbing activities. The contractor must provide a minimum of a 24 hour notice prior to //Q�3 <br /> , <br /> inspection. ' <br /> Erosion control shall be installed and maintained throughout the entire project and must � <br /> remain until vegetation has been established. <br /> A haul route shall be submitted to the City Engineer for approval and inspection prior to <br /> commencement of hauling from the site.The property owner shall be responsible for cleaning /�/� <br /> and repair of roadways for any adverse impacts. �^��� <br /> After final inspections(all life and safety issues) have been completed we will issue a Temporary <br /> Certificate of Occupancy for Model/Sales USE ONLY. If exterior improvements are not �//,�J� <br /> completed at that time, an additional escrow may be required. ��v� <br /> In the event of winter or other extended unfavorable weather conditions(which prevent the <br /> completion of the exterior improvements and/or as-built survey) a Temporary Certificate of �y� <br /> Occupancy(TCO) may be necessary. A TCO requires a$10,000 escrow. <br /> /' <br /> Prior to the issuance of a Certificate of Occupancy an as-built survey and hardcover calculations � <br /> must be submitted and approved. <br /> Advisory Comments <br /> Any changes to the exterior/landscaping improvements, i.e. patios,grading, sidewalks, retaining <br /> walls,etc. not currently shown on the approved survey and landscaping plan will require a ,/ ,� <br /> separate Zoning Permit application to be submitted and approved prior to the work ����� <br /> commencing. <br /> Any retaining walls that are over 4-feet in height or tiered walls not separated by twice of the ��� <br /> height of the lower wall require engineered plans and a building permit to be submitted and <br /> approved prior to construction. <br /> w:\street files\sandhill drive\540\builder acknowledgement form 2017-00961.docx <br />