Laserfiche WebLink
Christine Mattson <br /> From: Adam Edwards <br /> Sent: Wednesday,August 16, 2017 12:07 PM <br /> To: Christine Mattson; Roger Peitso <br /> Subject: RE: 540 Sandhill Drive/#2017-00961 <br /> Chris, <br /> I've reviewed the subject Grading Plan and stamped it approved with comment. <br /> 1. I revised the plan to indicate perimeter erosion control measures(silt fence, bio logs,etc.)down gradient from <br /> proposed work. Measures must be installed by the Contractor and inspected by the City prior to any work. <br /> Contractor must provide a minimum 24 hour notice prior to inspection. <br /> 2. A separate Utility Permit will be required for the water and sewer connections <br /> Adam <br /> From:Christine Mattson <br /> Sent:Tuesday,August 15,2017 11:28 AM <br /> To:Adam Edwards<aedwards@ci.orono.mn.us>; Roger Peitso<rpeitso@ci.orono.mn.us> <br /> Subject:540 Sandhill Drive/#2017-00961 <br /> We received a building permit application for a new house(aka Sales Office). <br /> I have noted the following: <br /> • A 4th egress window is shown within the D/U easement on the building plans. This must be removed. The#4 <br /> egress window is not shown on the survey. <br /> • Survey does not show erosion control <br /> Please review and provide comments. <br /> Thank you! <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelley Parkway � Orono � MN � 55356(physical addressJ <br /> PO Box 66 I Crystal Bay p MN I 55323-0066 (mailing addressJ <br /> '� 952.249.4620 I 8 952.249.4616 <br /> � cmattson@ci.orono.mn.us 0 �] www.ci.orono.mn.us <br /> Summer Office Hours: (Monday, May 22 through Friday,September 1,201� <br /> Monday-Thursday: 7:30 am to 5 pm <br /> Friday: 7:30 am to 11:30 am <br /> 1 <br />