Laserfiche WebLink
Christine Mattson <br /> From: Adam Edwards <br /> Sent: Tuesday,August 01, 2017 7:58 AM <br /> To: Christine Mattson; Roger Peitso <br /> Subject: RE: 530 Sandhill Drive/#2017-00847 <br /> Chris, <br /> I've reviewed the subject Grading Plan and Stamped it approved. <br /> 1. A separate utility permits will be required for the sewer and water connections. <br /> 2. Perimeter sediment control measures should be installed by the Contractor and inspected by the City prior to <br /> any work,including demolition.Contractor must provide minimum 24 hour notice prior to inspection. <br /> Adam <br /> From:Christine Mattson <br /> Sent: Monday,July 31,2017 4:37 PM <br /> To:Adam Edwards<aedwards@ci.orono.mn.us>; Roger Peitso<rpeitso@ci.orono.mn.us> <br /> Subject: 530 Sandhill Drive/#2017-00847 <br /> We received a building permit application for a new house at 530 Sandhill Drive. Please review and provide comments. <br /> Thank you! <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelley Parkway I Orono { MN I 55356(physical addressJ <br /> PO Box 66 � Crystal Bay 0 MN � 55323-0066(mailing addressJ <br /> '� 952.249.4620 I 8 952.249.4616 <br /> � cmattson@ci.orono.mn.us � � www.ci.orono.mn.us <br /> Summer Office Hours: (Monday,May22 through Friday,Septemberl,201� <br /> Monday-Thursday: 7:30 am to 5 pm <br /> Friday: 7:30 am to 11:30 am <br /> OUR OFFICE WILL BE CLOSED: Monday,September 4,2017 <br /> 1 <br />