Laserfiche WebLink
� <br /> . <br /> Rusty Olson's--Soil and Percolation <br /> RECEIi/E� <br /> Testing <br /> AU G 0 2� 2006 <br /> Joseph J. Olson--MPCA License#810 CITY OF OROt�O <br /> 11481 Riverview Rd. NE, Hanover, MN 55341 <br /> (763) 498-8779 Fax (763) 498-8290 <br /> August O1,2006 <br /> Steve Lindo <br /> 2140 Salem Court <br /> Orono,Hennepin County <br /> This on-site Sewage Treatment System is designed for a Type i,Five-bedroom home in accordance with the Minnesota <br /> Pollution Control Agency Chapter 7080 and local ordinances. <br /> The seasonally saturated soils were located at 18"-26"(mottled soil). Due to seasonally saturated soils,a pressurized <br /> Mound System will need to be installed to treat septic ef�luent. The bottom ofthe treatment area most be located at <br /> least 3'above the saturated soils.Due to limited space.The mound rockbed must be split into two rock beds.The <br /> proposed rockbed are to be 32 Feet in length. <br /> This svstem is designed with duel rockbed using unlevel pressure distribution.See desien sheets.Use 7/32 inch <br /> perforations on the Iaterals. <br /> The supply line must be insulated under the driveway. <br /> The absorption area of the proposed system does not overlap and is greater than 10 feet from the property line. <br /> The soils at a depth of 12"have a percolation rate averaging 6 MPI. <br /> All neighboring wells are located greater than 100'away from proposed treatment area. <br /> The existing lift station must be turned into a septic tank and a new 1250 gallon lift station must be installed. <br /> A pumping chamber will need to be installed to lift the ei�luent to the treatment area. The power supply and switches <br /> must be located outside the manhole and pumping chamber in a weatherproof enclosure. A warning device must be <br /> installed with light and sound devices;this is in case of a pump failure.The manifold and supply line must have back <br /> drainage to the pumping chamber. The distribution pipes shall have their ends capped. Be sure the rock and sand fill <br /> materials are clean. The sod layer below the entire mounded area must be turned over,just break up the sod and be <br /> sure not to over work. <br /> Keep all heavy equipment off of the proposed treatment areas before,during and after construction. The area <br /> around both sites must be fenced off by the contractor before any construction begins.This Design is not valid <br /> and the System will need to be relocated if failure to protect the areas proposed for On-Site Sewage Treatment <br /> occurs. <br /> With proper installation and maintenance,this system should have no problem in treating scptic effluent effectively. <br /> Nothing other than gray water,(laundry,showers,etc.) Human water and toilet tissue should be disposed of into the <br /> septic tanks. (iarbage disposals are not recommended. Additives must not be used;they may cause hannful damage to <br /> your septic system. It is recommended that you pump the tank every year for 1 tank every two years for two tanks. <br /> Sincerely, <br /> �".!�"Y��P flRONn <br /> ��' L�N tt�V�F,Wn <br /> Joseph J.Olson jj1T �.(�� <br /> DA �: ` `� - �i� ��MIT Nn —______....., <br /> � 1�tt�rr�r� <br /> I��:�ifYa*�5 n����rr•.n <br /> � �:< � „.SLh�1i'I <br /> ��'�������11� �. ,�.. .!!11���)l'(}� <br /> in fult c�ep� �{e ��dc. <br /> i',��quirement�i�►C ��ti� ,rcritlw. <br /> 5t:1:P THIS PLAI� ��AL. <br />