My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-P10476 - new septic system
Orono
>
Property Files
>
Street Address
>
S
>
Salem Court
>
2140 Salem Court - 27-118-23-31-0012
>
Septic
>
2006-P10476 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:19:38 PM
Creation date
8/1/2018 2:24:57 PM
Metadata
Fields
Template:
x Address Old
House Number
2140
Street Name
Salem
Street Type
Court
Address
2140 Salem Court
Document Type
Septic
PIN
2711823310012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' - Unlevel Pressure Distribution System Design - 10/25/04 <br /> 1. Lay out system in order of highest to lowest elevation <br /> Line 1 Elevation 111.2 ft Length 92 ft <br /> Line 2 Elevation 110.2 ft Length 92 ft <br /> Line 3 Elevation ft Length ft <br /> �- <br /> Linei 4 Elevation ft Length ft <br /> Line� 5 Elevation ft Length � ft <br /> 2. Change in Elevation over the Trenches <br /> Highest elevation-lowest elevation: 111.2 - 110.2 = 1.0 feet <br /> 3. Total Head=head at orifices(2ft)+change in elevation(2) 2 ft + 1.0 ft = 3.0 feet <br /> (if greater than 5 feet modify design) <br /> 4. Calculate pressure head for each system <br /> 1. Highest Trench Elevafion the Head=2 feet <br /> 2. Po+ (E1 -Ex)=DEx <br /> Line 1 Elevation 111.2 2+ [E1 -E1]=2+ [ 111.2 - 111.2 ] = 2.0 feet <br /> Line 2 Elevation 110.2 2+[E1 -E2]=2+ [ 111.2 - 110.2 ] = 3.0 feet <br /> Line 3 Elevation 0.0 2+ [E1 -E3]=2+ [ 111.2 - 0.0 ]= 0.0 feet <br /> Line 4 Elevation 0.0 2+[E1 -E4]=2 +[ 111.2 - 0.0 ]= 0.0 feet <br /> Line 5 Elevation 0.0 2+[E1 -E5j=2 + [ 111.2 - 0.0 ] = 0.0 feet <br /> 5. Determine flow rate per hole(See figure E-6) <br /> Line 1 Pres 2.0 Perf Diameter 7/32 = 0.80 gpm <br /> Line 2 Pres 3.0 Perf Diameter 7/32 = 0.98 gpm <br /> Line 3 Pres 0.0 Perf Diameter = gpm <br /> Line 4 Pres 0.0 Pert Diameter = gpm <br /> Line 5 Pres 0.0 Perf Diameter = gpm <br /> 6. Calculate flow for Line 1 <br /> Number of perForations= len th of pipe-2)/spacing]+1 <br /> [( 92 ft-2ft) / 3 ft]+1 = 31 pertorations(Check figure E-4 to make sure it is ok) <br /> Flow= number of perforations x flow rate <br /> 31 perf x 0.80 gpm = 24.8 gpm <br /> 7. Calculate the gallons per foot for Line 1 <br /> Gallons/length= 24.8 gpm / 92 ft= 0.27 gpm/ft <br /> E�Perforation Discha e in GPM E-d Maximum Number of 1/4 inch pertorations <br /> Pressure r lateral to uarantee<10°k discha e variation <br /> Head Perforation Diameter in inches Perforation <br /> feet 1/8 3/16 7/32 1/4 Spacing <br /> 1 0.18 0.42 0.56 0.74 feet 1 inch 1.25 incl 1.5 inch 2.0 inch <br /> 1.5 0.22 0.51 0.68 0.90 2.5 8 14 18 28 <br /> 2 0.26 0.59 0.80 1.04 3.0 8 13 17 26 <br /> 2.5 0.29 0.65 0.88 1.17 3.3 7 12 16 25 <br /> 3 0.32 0.72 0.98 1.28 4.0 7 11 15 23 <br /> 4 0.37 0.83 1.13 1.47 5.0 6 10 14 22 <br /> 5 0.41 0.94 1.26 1.65 Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.