My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: bldg/grading/buffer plans
Orono
>
Property Files
>
Street Address
>
N
>
North Arm Drive
>
520 North Arm Drive - 06-117-23-31-0005
>
Correspondence
>
Re: bldg/grading/buffer plans
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:26:09 PM
Creation date
7/31/2018 12:37:37 PM
Metadata
Fields
Template:
x Address Old
House Number
520
Street Name
North Arm
Street Type
Drive
Address
520 North Arm Dr
Document Type
Correspondence
PIN
0611723310005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' <br /> Clean Water Act Section 402 <br /> Under Section 402(P) of the Clean Water Act,the U.S. Environmental Protection <br /> Agency is required to develop regulations for stormwater di:ccharges. The <br /> Minnesota Pollution Control Agency (MPCA)has the authority to regulate the <br /> stormwater program under the National Pollution Discharge Elimination System <br /> (NPDES)program. The MPCA has written a general permit for construction sites, <br /> which grade more than 1 acre. As of July 1, 2003, a permit application and fee of <br /> $400 (no plans or specifications)must be sent to the MPCA at least 48 hours prior <br /> to commencement of land disturbance activities. The permit application required <br /> the site owner and contractor to certify the provision of the general permit, <br /> including developing and implementing temporary and permanent erosion and <br /> sediment control plans,will be followed. The general permit requires that <br /> stormwater dischazges be preponded before dischazge to waters of the state <br /> (including wetlands). The general permit also requires inspection and <br /> maintenance of the erosion and sediment control facilities on a weekly basis. If <br /> site grading exceeds one-acre,this permit will have to be obtained from the <br /> MPCA. <br /> If you have any questions or need additional information,please contact me. Hult& <br /> Associates, Inc. appreciates the opportunity to provide you with wetland delineation <br /> services. If you fiave additional needs for our services on permitting,planning, surveying, <br /> or engineering for this or other projects in the future,please give us a ca11. <br /> . Sincerely, <br /> , <br /> HULT&ASSOCIATES, INC. ' <br /> C:r����«�� <br /> David M. Heinrichs, <br /> Wetland/Soil Scientist ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.