My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Escrow agreement
Orono
>
Property Files
>
Street Address
>
N
>
North Arm Drive
>
520 North Arm Drive - 06-117-23-31-0005
>
Misc
>
Escrow agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:26:09 PM
Creation date
7/31/2018 12:28:10 PM
Metadata
Fields
Template:
x Address Old
House Number
520
Street Name
North Arm
Street Type
Drive
Address
520 North Arm Dr
Document Type
Misc
PIN
0611723310005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � o <br /> � September 17,2008 <br /> . � <br /> � An outline of the suggested materials and procedures to be used to <br /> � � establish a prairie grass and wildflower buffer along the <br /> � � Shore of the Pellizer property in Orono <br /> a� � <br /> a� � <br /> � � <br /> � � A. Bidder Qualifications: The contractor shall submit their qualifications for approval at <br /> Q <br /> 3 N Q least three weeks prior to the bid closing. To qualify, a contractor must document the <br /> O N .� Following: <br /> .,� r. <br /> � � <br /> �' � k l. That the personnel supervising and planting this project have documented experience <br /> w a" w successfully planting prairies. <br /> 2. That the contractor's business specializes in prairie and savanna plantings and/or <br /> restorations. <br /> 3. Assignment of a Qualified Labor Force thoroughly familiar and trained in the work. <br /> B. Site Preparation: <br /> 1. In areas with actively growing vegetation apply Roundup Originalma�c�herbicide as <br /> per manufacturer's directions. Allow a minimum of 10 days before disturbing the <br /> vegetation with other procedures. <br /> 2. Burn off the dead vegetation by implementing a controlled burn using appropriate <br /> procedures, equipment and permits. <br /> 3. Respray with Roundup Originalmax�herbicide if regrowth of vegetation occurs and <br /> when it reaches approximately 10" to 12" in height. <br /> 4. Lightly till the soil to create an open seedbed. <br /> 5. Harrow or rake the soil to create a firm, smooth seedbed. <br /> C. Seed and Seeding: <br /> 1. Seeding dates shall be in the spring or summer before August 10'h or in the fall between <br /> September 20�' and freeze-up. <br /> 2. All seed shall be applied by broadcasting. <br /> 3. The seed mixes shall consist of the following species and amounts based on a rate of 12 <br /> lbs. native grass mix per acre and 5 lbs of native forbs per acre: <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.