Laserfiche WebLink
make a final inspection of roofmg and prepare a written report to Architect,describing nature and extent <br /> of deterioration or damage found. <br /> B. Repair or replace(as required)deteriorated or defective work found at the time of final <br /> inspection to a condition free of damage and deterioration at the time of Substantial Completion and <br /> according to the requirements of the specified warranty. <br /> END OF SECTION 07530 <br /> SINGLE-PLY MEMBRANE ROOFING <br /> Page 6 of 6 <br />