My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arch/structural specs for addition
Orono
>
Property Files
>
Street Address
>
A
>
Abingdon Way
>
2180 Abingdon Way - 03-117-23-24-0012
>
Misc
>
Arch/structural specs for addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:36:04 PM
Creation date
7/26/2018 3:33:21 PM
Metadata
Fields
Template:
x Address Old
House Number
2180
Street Name
Abingdon
Street Type
Way
Address
2180 Abingdon Way
Document Type
Misc
PIN
0311723240012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.6 QUALITY ASSURANCE <br /> A Plastering Contractor Qualifications <br /> 1. Contractor shall provide a list of completed work of equal scope. <br /> B. Field Mock-Ups: Prepare field mock-ups to match preliminary samples approved by the <br /> Architect. <br /> 1. The Architect shall deternune location and size. <br /> 2. Mock-up(s) shall accurately represent the products to be installed on the project, <br /> � utilizing the same tools, and techniques proposed for Project application. <br /> 3. The approved mock-up(s) shall be available and maintained at the job site for <br /> reference. <br /> C. Pre-Installation Conference: Schedule a pre-installation conference with the Owner andlor <br /> Architect and General Contractor,to review the work of this Section. <br /> _ 1.7 DELIVERY,STORAGE AND HANDLING <br /> � A. Deliver materials in original containers with labels intact and legible. Store and protect <br /> materials in cool, dry location, out of sunlight, protected from weather and other harmful <br /> environment,and at a temperature above 40°F and below 110°F in accordance with manufacturer's <br /> instructions. <br /> 1.8 PROJECT/SITE CONDITIONS <br /> A. Protect adjacent construction materials that are likely to be soiled by the application <br /> process. <br /> B. Environmental Requirements <br /> 1. Cement Plaster <br /> a. Cold Weather <br /> � 1)Do not use frozen materials or materials that have been previously frozen. <br /> ' 2)Do not apply cement plaster to frozen surfaces or surfaces containing frost. <br /> 3) Installation Ambient Air Temperature: Do not mix materials or apply <br /> cement plaster when ambient temperaiure is less than 40° F. Ambient air <br /> temperature must remain at 40° F and rising, and remain so for a minimum <br /> 24 hours thereafter. <br /> b. Hot Weather <br /> 1)Protect cement plaster from uneven and excessive evaporation during hot, <br /> windy, or dry weather.Avoid application in direct sunlight. <br /> 2)In hot,windy or dry weather,the cement plaster should be spray misted <br /> with potable water and then covered with a single sheet of clear polyethylene <br /> plastic. <br /> Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.