My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arch/structural specs for addition
Orono
>
Property Files
>
Street Address
>
A
>
Abingdon Way
>
2180 Abingdon Way - 03-117-23-24-0012
>
Misc
>
Arch/structural specs for addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:36:04 PM
Creation date
7/26/2018 3:33:21 PM
Metadata
Fields
Template:
x Address Old
House Number
2180
Street Name
Abingdon
Street Type
Way
Address
2180 Abingdon Way
Document Type
Misc
PIN
0311723240012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. Gypsum cementitious underlayment:USG.LEVELROCK <br /> B. Mineral Aggregate: ASTM C 332,Group I. <br /> C. Sand Aggregate: ASTM C 33. <br /> D. Water: Clean,potable. <br /> E. Subfloor Primer or bonding agent:USG.LEVELROCK underlayment Primer <br /> 2.2 DESIGN 1VIIX <br /> A. General: Design lightweight Gyp insulating concrete mix shall be in strict accordance with <br /> Manufactures recommendations <br /> Mi�c design shall be proportioned to provide an average(three cube)compressive strength of 2,500 psi or <br /> greater with a density of 115 pounds per cubic ft. No cube sample taken for testing shall be less than <br /> 2,000 psi. <br /> PART 3-EXECUTION <br /> 3.1 PREPARATION <br /> 1. Condition and cleaning of subfloor: Subfloor shall be clean of mud,grease,and all other <br /> contaminating debris before installation begins. Sub strates must be clean and dry. Set <br /> temporary dams at max of 8' <br /> 2. Leak prevention: Fill Cracks and voids in subfloor with insulation. Caulk or patch to stop <br /> any potential leakage of material. <br /> 3. Priming of subfloor:Prime the subfloor using the LEVELROCK subfloor primer. <br /> Priming instructions vary according to the type of substrate. Multiple coats of primer may <br /> be necessary. Care should be taken to protect radiant heating coils during application of primer. <br /> 4. Building Joints: Allow joints to continue throughout the underlayment at the same width as the <br /> building joints. <br /> 3.2 PLACEMENT/APPLICATION <br /> A. Application:Place underlayment%s"min thickness over type of radiant tubes. This will require a <br /> total thickness of 1-1/2"of gypsum cementitious underlayment. It is recommended that the installation be <br /> made in two applications. The first application should be poured 1/8"minium over the top surface of the <br /> radiant heat tube. The second application should be made within 1 hr of the first. If more than one hour has <br /> expired between the first and second application,the use of LEVELROCK brand primer is recommended <br /> between applications to insure proper bonding. The thickness of the second application should be such that <br /> the gypsum cementitious underlayment shall be a minimum of'h"over the top of the radiant heat tubes. <br /> Concrete must be properly cured a minium of 28 days prior to the underlayment installation.Immediately <br /> spread and screed product to a smooth surface.Except at building joints,place product as continually as <br /> possible so that no slurry is placed against product that has obtained an initial set. Care must be taken to <br /> protect radiant heating tubing during the application of the gypsum underlayment <br /> Place lightweight g,ypsum concrete in accordance with manufactures instructions,using <br /> equipment and procedures to avoid segregation of mix and loss of air content. Deposit and screed in a <br /> continuous opera.tion until a continuous section is completed. Do not vibrate or work mix except for <br /> screeding or floating. Place material to depths shown.L:eave top surface in smooth condition to receive <br /> finish ed flooring application. Bedrooms shall a rough finish to receive the%2' layer of waterproof concrete. <br /> B. Begin curing operations immediately after placement,and air cure for not less than 3 days in <br /> accordance with manufacturer's recommendatioas. <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.