My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arch/structural specs for addition
Orono
>
Property Files
>
Street Address
>
A
>
Abingdon Way
>
2180 Abingdon Way - 03-117-23-24-0012
>
Misc
>
Arch/structural specs for addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:36:04 PM
Creation date
7/26/2018 3:33:21 PM
Metadata
Fields
Template:
x Address Old
House Number
2180
Street Name
Abingdon
Street Type
Way
Address
2180 Abingdon Way
Document Type
Misc
PIN
0311723240012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
concrete class placed in any one day;one specimen tested at 7 days,two specimens <br /> tested at 28 days,and one specimen retained in reserve for later testing if required. <br /> f. When total quantity of a given class of concrete is less than 50 cu.yd.,Architect may ` <br /> waive strength testing if adequate evidence of satisfactory strength is provided. <br /> C. Test results will be reported in writing to Architect,ready-mix producer,and Contractor <br /> within 24 hours after tests.Reports of compressive strength tests shall contain the Project identification name <br /> and number,date of concrete placement,name of concrete testing service,concrete type and class, location <br /> of concrete batch in structure,design compressive strength at 28 days,concrete mix pmportions and materials, <br /> compressive breaking strength,and type of break for both 7-day tests and 28-day tests. <br /> END OF SECTION 03300 <br /> POURED-IN-PLACE CONCRETE <br /> Page 8 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.