Laserfiche WebLink
3.14 PROTECTION <br /> A. Protecting Graded Areas: Protect newly graded azeas from traffic,freezing,and erosion. Keep free <br /> of trash and debris. <br /> B. Protecting existing site marked vegetation and drawing marked vegetation: Protect existin�trees, <br /> shrubs,Etc. from damage within grading limits <br /> C. Repair and re-esta.blish grades to specified tolerances where completed or partially completed <br /> surface become eroded, rutted, settled, or lose compaction due to subsequent conshuction operations or <br /> weather conditions. <br /> 1. Scarify or remove and replace material to depth directed by the Architect; reshape and <br /> recompact at optimum moisture content to the required density. <br /> D. Settling: Where settling occurs during the Project correction period,remove finished surfacing, <br /> backfill with additional approved material,compact,and reconstruct surfacing. <br /> 1. Restore appearance,quality,and condition of finished surfacing to match adj acent work,and <br /> eliminate evidence of restoration to the greatest elctent possible. <br /> 3.15 DISPOSAL OF SURPLUS AND WASTE MATERIALS <br /> A. Disposal: Remove surplus satisfactory soil and waste material,including unsatisfactory soil,trash, <br /> and debris,and legally dispose of it off the Owner's property. � <br /> END OF SECTION 02200 <br /> EARTHWORK <br /> Page 6 of 6 <br />