My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arch/structural specs for addition
Orono
>
Property Files
>
Street Address
>
A
>
Abingdon Way
>
2180 Abingdon Way - 03-117-23-24-0012
>
Misc
>
Arch/structural specs for addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:36:04 PM
Creation date
7/26/2018 3:33:21 PM
Metadata
Fields
Template:
x Address Old
House Number
2180
Street Name
Abingdon
Street Type
Way
Address
2180 Abingdon Way
Document Type
Misc
PIN
0311723240012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l. Stockpile soil materials away from edge of excavations. Do not store within drip line of <br /> remaining trees. <br /> 3.8 BACKFILL <br /> A. Backfill excavations promptly,but not before completing the following: <br /> 1. Acceptance of construction below fmish grade including perimeter insulation where <br /> applicable. <br /> 2. Surveying locations of underground utilities for record documents. <br /> 3. Testing,inspecting,and approval of underground utilities. <br /> 4. Concrete form work removal. <br /> 5. Removal of trash and debris from excavation. <br /> B. Place and compact initial bac�ll of satisfactory soil material or subbase material,free of particles <br /> larger than 1 inch,to a height of 12 inches over the utility pipe or conduit. <br /> C. Coordinate backfilling with utilities testing. <br /> D. Fill voids with approved backfill materials as shoring and bracing,and sheeting is removed. <br /> E. Place and compact final bacl�ill of satisfactory soil material to final subgrade. <br /> F. Install warning tape directly above utilities, 12 inches below finished grade,except 6 inches below <br /> subgrade under pavements and slabs. � <br /> G. Drainage Bacicfill: Place and compact drainage backfill of filtering material over subsurface drain, <br /> in width indicated,to within 12 inches of fmal subgrade. Overlay drainage backfill with one layer of filter <br /> fabric,overlapping edges at least 6 inches. <br /> 3.9 FILL <br /> A. Preparation: Remove vegetation,topsoil,debris,wet,and unsatisfactory soil materials,obstructions, <br /> and deleterious materials from ground surface prior to placing fills. <br /> 1. Plow strip,or break up sloped surfaces steeper than 1 vertical to 4 horizontal so fill material <br /> will bond with existing surface. <br /> A. Place fill material in layers to required elevations for each location listed below. <br /> 1. Under grass,use satisfactory excavated or bonow soil material. <br /> 2. Under wallcs and pavements, use subbase or base material, or satisfactory excavated or <br /> borrow soil material. <br /> 3. Under steps and ramps,use subbase material. <br /> 4. Under building slabs,use drainage fill material. <br /> 3.10 MOISTURE CONTROL <br /> A. Grade all contours so the slope is away from all structures and starting 6"below finished building <br /> surfaces IE,stucco,wood,Etc. <br /> 3.11 COMPACTION <br /> Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.