My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arch/structural specs for addition
Orono
>
Property Files
>
Street Address
>
A
>
Abingdon Way
>
2180 Abingdon Way - 03-117-23-24-0012
>
Misc
>
Arch/structural specs for addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:36:04 PM
Creation date
7/26/2018 3:33:21 PM
Metadata
Fields
Template:
x Address Old
House Number
2180
Street Name
Abingdon
Street Type
Way
Address
2180 Abingdon Way
Document Type
Misc
PIN
0311723240012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H. Structures: Buildings,footings,foundations,retaining walls,slabs,tanks,curbs,mechanical and <br /> electrical appurtenances,or other man-made stationary featwes constructed above or below gtound surface. <br /> I. Utilities include on-site underground pipes,well,septic system,conduits,ducts,and cables,as well <br /> as underground services within building lines. <br /> 1.4 QUALTTY ASSURANCE <br /> A. Codes and Standards: Perform earthwork complying with requirements of authorities having <br /> jurisdiction. <br /> 1. Before commencing earthwork, meet with the Architect, and other concerned entities as <br /> required. Review earthwork procedures and responsibilities including testing and inspection <br /> procedures (if any)and requirements. Record discussions and agreements and furnish a <br /> copy to each participant. <br /> 1.5 PROJECT CONDITIONS <br /> A. Existing Utilities: Do not interrupt existing utilities serving facilities occupied by the Owner or <br /> others except when permitted in writing by the Architect and then only after acceptable temporary utility <br /> services have been provided. <br /> 1. Provide a minimum 48-hours'notice to the Architect and receive written notice to proceed <br /> before interrupting any utility. <br /> B. Coordinate with utility companies and Owners as to shutoff services if lines are active. <br /> PART 2-PRODUCTS <br /> 2.1 SOIL MATERIALS " <br /> A. General: SEE STRUCTLTRAL NOTES AND DETAILS: <br /> 2.2 ACCESSORIES <br /> A. Warning Tape: Acid-and alkali-resistant polyethylene film warning tape manufactured for marking <br /> and identifying underground utilities, 6 inches wide and 4 mils thick, continuously inscribed with a <br /> description of the utility. <br /> B. Detectable Warning Tape: Acid-and alkali-resistant polyethylene film warning tape manufactured <br /> for marking and identifying underground utilities,6 inches wide and 4 mils thick minimum,continuously <br /> inscribed with a description of the utility,with metallic core encased in a protective jacket for corrosion <br /> protection,detectable by metal detector when tape is buried up to 2'-6"deep. <br /> 1. Tape Colors: Provide tape colors to utilities as follows: <br /> a. Red: Electric. <br /> b. Yellow: Gas,oil,steam,and dangerous materials. <br /> c. Orange: Telephone and other communications. <br /> d. Blue: Water systems. <br /> e. Green: Sewer systems. <br /> Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.