Laserfiche WebLink
' <br /> IWOOD SHAKES <br /> SECTION 07311 <br /> ' PART 1 -GENERAL <br /> THIS SECTION USES THE TERM °°ARCHiTECT.'° <br /> ' l.l RELATED DOCUMENTS <br /> A. Drawings and general provisions of the Contract, including General and Supplementary <br /> ' Conditions and Divisional Specification Sections, apply to this Section. <br /> 1.2 SUMMARY <br /> ' A. This Section includes wood shakes and required flashing. <br /> B. Related Sections: The following Sections cantain requirements that relate to this Section: <br /> ' 1. Division 6 Section "Rough Carpentry"for underlayment and wood framing. <br /> 1.3 SUBNdITTQI.S <br /> ' A. General: Submit the following in accordance with Conditions of Contract and Divisional <br /> Specification Sections. <br /> ' B. Product data for each type of product specified,including details of construction relative to <br /> raaterials,dimensions of individual components,profiles,textures,and colors. <br /> ' C. Samples for initial selection purposes in form ofmanufacturer's sample finishes showing full <br /> range of colors and profiles available. <br /> ' D. Samples for verification purposes in form of two full-size units of each type of shingles <br /> required: <br /> 1.4 QUALITY ASSURANCE <br /> ' A. Fire Performance Characteristics: Provide products that are identical to those tested for the <br /> specified fire performance characteristics by UL or other testing and inspecting <br /> ' organizations acceptable to authorities having jurisdiction. Identify products with <br /> appropriate markings of applicable testing and 'rnspecting organization. <br /> 1. Fire Resistance Ratings: As indicated by reference to design designations in tTL <br /> ' "Fire Resistance Directory." <br /> LS I)ELTVERY, STORAGE,AND HANDLING <br /> ' A. Deliver materials to Project site in manufacturer's unopened bundles or containers with <br /> labels intact. <br /> ' �. Handle and store materials at Project site to prevent water damage, staining, or other <br /> physical damage. Store roll goods on erid. Cornply with manufacturer's recommendations <br /> for job site storage,handling, and protection. <br /> ' 1.6 PROJECT CONDITIONS <br /> ' �VOOD SHt�.I�ES Page 1 of 4 <br /> ' <br />