My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arch/Structural specs for cabana,pool,hot tub areas
Orono
>
Property Files
>
Street Address
>
A
>
Abingdon Way
>
2180 Abingdon Way - 03-117-23-24-0012
>
Misc
>
Arch/Structural specs for cabana,pool,hot tub areas
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:36:04 PM
Creation date
7/26/2018 3:15:05 PM
Metadata
Fields
Template:
x Address Old
House Number
2180
Street Name
Abingdon
Street Type
Way
Address
2180 Abingdon Way
Document Type
Misc
PIN
0311723240012
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> � A. Plastering Contractor Qualifica�ions <br /> ' 1. Contraetor shall provide a Iist of completed work of equal scope. <br /> 2. Contractor stiall hold a current certificate from the manufacturer of the acrylic finish <br /> � to apply that material. <br /> B. Field Mock-Ups:Prepare field mock-ups ta match preliminary samples approved by the <br /> Architect. <br /> , l. The Architect shall determine location and size. <br /> 2.. Mock-up(s)sha.11 accurately represent the products to be instalIed on the project, <br /> � utilizing the same tools,and techniques proposed for Project appiication. <br /> 3. The approved mock-up(s) shalI be available and maintained at the job site for <br /> reference. <br /> � C. Pre-Ltstallation Conference: Schedule a pre-iunstallation conference with the Architect <br /> and Contractor,to review the work of this Section. <br /> 1 A7 DELNERY, STORAGE AND HANDLING <br /> � A Deliver materials in original containers with labeis intact and legible. Store and protect <br /> materials in cool,dry locatiom, out of sunlight,protected from weather and other hannful <br /> ' environment, and at a temperature above 40' F and below 110° F in accordance with <br /> manufac€urer's instructions. <br /> 1.0$PROJECT/SITE CONDITIONS <br /> � A. Protect adjacent co��struction materials that are likely to be soiled by the application <br /> process. <br /> � B. Environmental Requirements <br /> 1. Cement Plaster <br /> a. Coid Weather <br /> � 1) Do not use frozen materials or materials that have been previously <br /> frozen. <br /> 2) Do not $pply cement plaster to frozeti surfaces or surfaces <br /> � comaining&ost. <br /> 3) Tnstallation Ambisnt Air Temperature:Do not mix materials or <br /> apply cement plaster when ambient temperatut�e is less than 40°P. <br /> Ainbient air temperature must remain at 40° F and rising, and <br /> � remain so far a minimum 24 hours thereafter. <br /> b.Hot Wea#her <br /> 1) Protect cement piaster from aneven�nd excessive evaporation <br /> during hot, windy, or dry weather. Avoid application in direct <br /> � sunligh�. <br /> 2} In hot,windy or dry weather,the cement plaster should be spray <br /> misted with potable water and then covered with a single sheet of <br /> � clear polyethyIene plastic. <br /> 2.Acrylic Primer and Finish Coatings <br /> a. Comply with acrylic fuush manufacturer's recommendations for conditions <br /> affecting product performance <br /> � b. Protect installation from direct precipitation during the application and the <br /> setting/curing period of primer and fmish coa� Ensure that the finish is <br /> fully set prior to re�noving prote�tive covering. <br /> ' c. Do not use frozen materiaIs. <br /> 04300 STUCCO Page 3 of 7 <br /> ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.