My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arch/Structural specs for cabana,pool,hot tub areas
Orono
>
Property Files
>
Street Address
>
A
>
Abingdon Way
>
2180 Abingdon Way - 03-117-23-24-0012
>
Misc
>
Arch/Structural specs for cabana,pool,hot tub areas
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:36:04 PM
Creation date
7/26/2018 3:15:05 PM
Metadata
Fields
Template:
x Address Old
House Number
2180
Street Name
Abingdon
Street Type
Way
Address
2180 Abingdon Way
Document Type
Misc
PIN
0311723240012
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' <br /> b. Air Content: ASTM C 173, volumetric in.ethod for lightweight or normal ' <br /> weight concrete; ASTM C 231, pressure method for normal weight <br /> concrete;one for each day's pour of each type of air-entrained concrete. <br /> c. Concrete Temperature: ASTM C lt}64; one test hourIy when air ' <br /> temperature is 40 deg� (4 deg C) and below, when 80 deg F (27 deg C} <br /> and above,aud one test for each set of compressive,-strengt�specimens. <br /> d. Compression Test Specimen: ASTM C 31; one set of four standard <br /> cyiinders for each compressive-strength test, unless otherwise directed. ' <br /> Mold and store cylinders for laboratory-cured test specimens except when <br /> field-cured test specunens are required. <br /> e. Compressive-Strength Tests: ASTM C 39; one set for each day's pour t <br /> exceeding 5 cu. yd. plus additionai sets for each 50 cu. yd. more than the <br /> first 2S cu.yd, of each conarete class placed in any one day;one specimen <br /> tested at 7 days, two specimens tested at 28 days, and one specimen ' <br /> retained in reserve for later testing if required. <br /> £. When total quantity of a given class of concrete is iess thar� 50 cu. yd., <br /> Architect may waive strength testing if adequate evidence of satisfactory <br /> sirength is provided. � <br /> C. Test results will be reported in writing to Architect, ready-mix producer, and Contractor <br /> witiiin 24 hours after tests. Reports of compressive strength tests shail contain the Project <br /> identification name and number, date of concrete placement, name of concrete testing ' <br /> service,concrete iype and class,location of concrete batch in struoture,design compressive <br /> strength at 28 days,concrete mix proportions and materials,compressive breaking strength, <br /> and type of break for both 7-day tests and 28-day tests. ' <br /> END�F SECTION 03300 <br /> t <br /> ' <br /> 1 <br /> 1 <br /> ' <br /> 1 <br /> , <br /> ' <br /> ' <br /> CONCRETE Page 8 of 8 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.