Laserfiche WebLink
D. Settlin : Where settlin occurs durin the Pro'ect correction eriod, remove finished ' <br /> � g g J P <br /> surfacing,bacidll with additional approved material,compact,and reconstruct surfacing. <br /> 1, Restore appearance,quality,and conditian of fiEnished surfacing to match adjacent ' <br /> work,and eIiminate evidence of restoration to the greatest extent possible. <br /> 3,15 DISPOSAL OF SURPLUS AND WASTE MATERIALS , <br /> A. Disposa.l: Remove surplus satisfa.ctory soil andwaste material,includingunsatisfactory soil, <br /> trash,and debris, Note: the surplus soil and unsatisfactory soil will be disposed of on the , <br /> Owner's property as directed by the ar�hitect. Only trash and debris will be legally disposcd <br /> of off site. <br /> , <br /> ' <br /> . ' <br /> . ' <br /> , <br /> . ' <br /> 1 <br /> � <br /> ' <br /> ' <br /> ' <br /> � <br /> , <br /> END OF SECTION 02200 Page 6 of 6 ' <br /> , <br />