My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arch/Structural specs for cabana,pool,hot tub areas
Orono
>
Property Files
>
Street Address
>
A
>
Abingdon Way
>
2180 Abingdon Way - 03-117-23-24-0012
>
Misc
>
Arch/Structural specs for cabana,pool,hot tub areas
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:36:04 PM
Creation date
7/26/2018 3:15:05 PM
Metadata
Fields
Template:
x Address Old
House Number
2180
Street Name
Abingdon
Street Type
Way
Address
2180 Abingdon Way
Document Type
Misc
PIN
0311723240012
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' <br /> 1. Acceptance of construction below finish grade including perimeter insulation where , <br /> applicable. <br /> 2. Surveying Iocations of underground utilities for record documents. <br /> 3. Testing,inspecting,and approval of underground utili#ies. � <br /> 4. Concrete form work removal. <br /> 5. Removal of trash and debris from excavation. <br /> B. Place az►d compact initial backfill of satisfactory soit material or subbase material,free of ' <br /> particles lazger than 1 inch,to a height of 12 inches over the utili#y pipe or conduit <br /> C. Coordinate backfilling with utilities testing. � <br /> D. Fil!voids with approved backf iti materials as shoring and bracing,and sheeting is removed. <br /> E. Place and compact final bacl�ill of sa.tisfactory soil material to final subgrade. ' <br /> F. Install wacning tape directly above utilities,l2 inches below finished grade,except 6 inches <br /> below subgrade under pavements and slabs. � <br /> G. Drainage Bacl�'ill:Place and compact drainage backfill of filtering material over subsurface <br /> drain,in width indicated,to within i2 inches of finai subgrade. Overlay drainage backfill <br /> with one layer of filter fabric, overlapping edges at Ieast 6 inches. ' <br /> 3.9 FILL <br /> A. Preparation: Remove vegetation, topsoil, debris, wet, and unsatisfactory soil materials, , <br /> obstructions,and deleteriaus materials from ground surface prior to placing fills. <br /> 1. Plow strip,or break up sloped surfaces steeper than 1 vertical to 4 horizontal so fill � <br /> material will bond with existing surface. <br /> A. Place fiIl material in layers to required elevations for each location listed below. , <br /> 1. Under grass,use satisfactory excavated or borrow soil material. <br /> 2. Under walks and pavements,use subbase or base material,or satisfactory excavated � <br /> or borrow soil ma#erial. <br /> 3. Under steps and ramps,use subbase material. <br /> 4. Under building slabs in all occupied areas,use special gas permeable material(for <br /> Radan protection). , <br /> 3.10 MOTSTURE C4NTROL <br /> A. Grade aIl contours so the slope is away from all structures and starting 6"below fmished � <br /> building surfaces TE,stucco,waod,Etc. <br /> 3.11 COMPACTION � <br /> A. Place bacicfill and fill materiais in layers not more thsn 8 inches in loose depth for material <br /> compacted by heavy compaction equipmen�and not more than 4 inahes in loose depth for ' <br /> material compacted by hand-operated tampers. <br /> B. Place backfill and fill materials evenly on all sides of structures to required elevations. <br /> Place backfill and fill uniformly along the full length of each structure. , <br /> C. Percentage of Maximum Ihy Density Requirements: Compact soil to not Iess than the <br /> followiag pexcenta.ges of maximum dry density according to ASTM D 1557: ' <br /> EARTHWORK Page 4 of 6 <br /> ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.