Laserfiche WebLink
S lin . 'n the Pr 'ec t' ve finished ' <br /> D. et# g Where settling occurs dun g o,� t conec zon penod., remo <br /> surfacing,backfill with additional a}�proved material,compact,and reconstruct surfacing. <br /> 1. Restore appearance,quaiity,and condition of finished surfacing to matc6 adjacent � <br /> work,and eliminate evidence of restoration to the greatest extent possible. <br /> 3.15 DISPOSAL OF SURPLUS AND WASTE MATER�ALS ' <br /> A. Disposal:Remove surplus satisfactory soil and waste material,includingunsatisfactory soil, <br /> trash,and debris, Note:the surplus soil and unsatisfactory soil will be disposed of on the , <br /> Owner's property as directed by the architect Only trash and debris will be legally disposed <br /> of off site. <br /> ' <br /> , <br /> � <br /> . � <br /> , 1 <br /> . ' <br /> � <br /> � <br /> � <br /> � <br /> ' <br /> � <br /> , <br /> END OF SECTION 0220Q Page b of 6 � <br /> � <br />