My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arch/Structural specs for cabana,pool,hot tub areas
Orono
>
Property Files
>
Street Address
>
A
>
Abingdon Way
>
2180 Abingdon Way - 03-117-23-24-0012
>
Misc
>
Arch/Structural specs for cabana,pool,hot tub areas
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:36:04 PM
Creation date
7/26/2018 3:15:05 PM
Metadata
Fields
Template:
x Address Old
House Number
2180
Street Name
Abingdon
Street Type
Way
Address
2180 Abingdon Way
Document Type
Misc
PIN
0311723240012
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> H. Structures: Building, Pool,Hot Tub, foatings,foundations,retaining walls, slabs,tanlcs, <br /> curbs, mechanical and electrical appurtenances, or other man-m�ade statioaary features ' <br /> constructed above or below ground surface. <br /> I, Utilities include on-site nnderground pipes,we11,septic system,conduits,ducts,and cables, , <br /> as well as underground services within buiiding lines. <br /> 1.4 QUALITY ASSURANCE <br /> A. Codes and Standards: PerForm earthwork complying with requirements of auttiorities , <br /> having jurisdiction. . <br /> I. Before commencing earthworlc, meet with the Architect, and other concerned , <br /> entities as required. Review earthwork procedures and responsibilities including <br /> testing and inspection procedures(if any)and requirements. Record discussions <br /> and agreements and fiunish a copy to each participant. ' <br /> 1.5 PROJECT C4NDITIONS <br /> A. ExistingUtilities: Do not interruptexistingutilities servingfacilides occupied bythe Owner ' <br /> or others except when permitted in writing by the Architect and then only after acceptable <br /> temporary utiiity services have been provided. <br /> 1. Provide a minimum 48-hours'notice to the Architect and receive written notice to ' <br /> proc�ed before intemipting any utility. <br /> B. Coordinate with utility compaaies and Owners as to shutoff services if lines are active. ' <br /> PART2-PRODUCTS <br /> 2.1 SOII,MA.TERIALS I <br /> A. General; SEE STRUCTURAL NOTES AND DETAILS: ' <br /> 2.2 ACCESSORIES <br /> A. Warning Tape: Acid-and alkali-resistant polyethyiene film warning tape manufactured for ' <br /> marking and identifying underground utilities,6 inches wide and 4 mils thick,continuously <br /> inscribed with a description of the utility. <br /> B. Detectabte Warning Tape: Acid- and alkali-resistaat polyethylene film warning tape ' <br /> manufactured for marking and identifying underground utilities,6 inches wide and 4 mils <br /> thick minimum,continuously inscribed with a description of the vtility,with metallic core <br /> encased in a protective jacket for corrosion protecfion,detectable by metaI detector whea t <br /> tape is buried up to 2'-6"deep. <br /> 1. Tape Colors: Provide tape colors to uti�ities as follows: ' <br /> a. Red: Electric. <br /> b. Yellow: Gas,oil,steam,and dangerous materials. <br /> c. Orange: Telephone and other communications. <br /> d. Blue: Water systems. ' <br /> e. Green: Sewer systems. <br /> PART 3-EXECLTTION , <br /> 3.1 PREPARATION <br /> �THWp� Page 2 of 6 ' <br /> , <br />
The URL can be used to link to this page
Your browser does not support the video tag.