My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arch/Structural specs for cabana,pool,hot tub areas
Orono
>
Property Files
>
Street Address
>
A
>
Abingdon Way
>
2180 Abingdon Way - 03-117-23-24-0012
>
Misc
>
Arch/Structural specs for cabana,pool,hot tub areas
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:36:04 PM
Creation date
7/26/2018 3:15:05 PM
Metadata
Fields
Template:
x Address Old
House Number
2180
Street Name
Abingdon
Street Type
Way
Address
2180 Abingdon Way
Document Type
Misc
PIN
0311723240012
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tConstruction Contract <br /> GENERAL CONDITIONS <br /> , B. IQo action or failure to act by the awner or any agent or employee of the Owner(including the Owner's Representative)shall constitute a waiver <br /> of any right or duty afforded it under the Contract Documents,nor shall any such action or failure to act constitute approval of or acquiescence in any breach <br /> thcreunder,except ac specifically agreed to in writing. The performance of any inspections or tesis,or the omission of any iaspections or tests,or a decision not to <br /> p�rform any inspection or test,by the Owner or any agent,employee or consultant of the Ovmer,shalt not be a waiver of any ofthe Contractofs obligations hereunder <br /> ' and shall not be construed as an approval or acceptance of the Work os any part thereo£ No payment to the Contractor(including Final Payment)or approval or <br /> acceptance by the Ownca of any Work shall constitute a 5na1 acceptance of such Work if it is later discovered that such Work was not perfoRned in accordance with <br /> the requirements of the Contract Documents. <br /> 41. PERFORMANCE BOND AND LABOR MAT�RiAI.PAYA4EPiT BOND <br /> � The Owner shall have the right to irquire the Contractor to fwnish at its sole discretion separate Perfo�mance and Labor and Material Bonds,in the form Exhibits <br /> G and H. These bonds shall cover the faithfut performance of the ConVactor's obligations hereunder and the payment of all obligations which arise hereunder at <br /> ' any time prior to or during the course of construction. Such bonds shall be made out for one hundred percent(100%)of the ConUract Sum. If the Contract Sum is <br /> increased under the terms hereof,the Contractor shall obtain a corresponding increase in the coverage of such bonds. The wst af these bonds will be paid by the <br /> Owner. Any premium surcharge in the cost of providing these bonds is to be paid by the Contrector. All dividends accruing on these bonds shall be paid by the <br /> Contractor to the Owner. <br /> ' 42. OWINERSHIP ANb 13SE OF DOCUMENTS <br /> All drawings,Project Plans and Spec'sfications,or other documentation,and copies thereof,furnished by the Owner or any agent,employee or cnnsultant ofthe Owner, <br /> or architect,are and shall remain the property ofthe Owner. They aze to be used only wiih respect to this Project and are not to be used on any ott�er project. wth <br /> ' the exception of one contcact set for the Contractor,such documents fumished to the Contractor aze to be returned or suitably accounted for to the Owner on request <br /> at the completion of the Work. <br /> 43. CUTTING AND PATCIiING OF WORK <br /> , A. The Conhactor shall be responsible for aU cutting,fitting or patching that may be required to complete the Work or to make its several pazts <br /> fit together propefly. <br /> ' B. The Contractor shall not damage or endanger any portion of ihe Work or the Work of the Owner or of any separaze contractor by cutting, <br /> patching or otherwise altering any Work,or by excavation.The Contractor shall not cut or otherwise alter the Work ofthe Owner or ofany separate conUactor,except <br /> with the written consent of the Owner and of such separate conuractor. The Contractor shall not unre�onably withhold fmm the Owmer or from any separate <br /> contractor his consent to cumng or othennse altering the Work. <br /> ' 44. OWNER-FURNISHED MATERIAL <br /> The Owna reserves the right to procure certsin materials for the Contractor's use on the Project,as designated by the Owner.The Conuractor shall provide the Owner <br /> with proposed quanti6es ofsuch materials.The Owner will review the Contractor's proposal and then the Contractor and Qwnerwill mutually agee on the quantities <br /> ' suH'icieirt to complete the Project Upon such agreamen�the Contractor shall cextify in writing that the agreed upon quantities are sufficient to complete ihe Proj ect. <br /> If additional quantides of materials are required to complete the Project,through no fault of the Owner,such excess qvantities of materials will be provided by the <br /> Ovmer at the Contraetor's expense. The Owner shall have the right to direct the Camactor to procure any additional materiais. If the Contractor fails to do so,the <br /> Ownec sha11 procure the materials and bill the Contractor. TI►e Contractor witl be required to pay all necxssary shipping,handling and air-freight ch�to ensure <br /> ' timely deliveay of such addiHonal materia�s. <br /> 45. IVIISCELLANEOUS <br /> A. The Contract Documents shall be consnued in accordance with the(aws of the state in which the Project is located, <br /> ' B. If any of the provisions of the Coniraci Documents shal!contravene or be invalid under sach laws,sach contravention or invalidity shall not <br /> invalidate the whole Contract or any other provision contained within the Contract Documents,but the Contract Documents shall be construed as if not oontaining <br /> 16e provision held w be invalid,and the rights and obligations of the parties shaEl be enforced accordingfy. <br /> , C. The captions ofParagaphs and various Subpmagraphs in the Contract Documents are inserted only as a matter ofconvenience and forreference <br /> and in no way define,limit or describe tt►e scope of any Paragraph or Subparagraph herein. <br /> ' D. Words of any gender used in the Contrad Documents shall be held ro inclvde any other gender,and words used in the singular shall be held <br /> to include the plural,when the sense requires. <br /> E. All provisions of the Conhact Documents which by their terms require perfomtance by either the Owner or the ContracWr aRer lermination <br /> ' of ffiis Contract shall survive any such temiination. <br /> F. Any and all disputes arising hereunder sha31 be resolved hy the courts of competent jurisdictiort located in the state in which the Project is <br /> located. <br /> ' <br /> ' <br /> co�.me 00810-20 <br /> , 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.