Construction Contract �
<br /> GENERAL CONDITIONS
<br /> continuation of such coverage shall be submitted to Ownec '
<br /> c) All insurance policies under Paragraph 28{A}shall not be cance{led or adversely materially changed except afterthirty
<br /> (30)days advance written notice to Owner. Upon receipt of any notice of cancellation or adverse material change,Conkactor shall within
<br /> ten(10)days procure replac:ement policies of insurance. If Contractor fails to procure aad maintain acceptable policies of insurance in �
<br /> accordance with the tecros hereo�then Owner may,at Owrte�'s op6on,obtain such insurance at the cost and expense of Contractor,without
<br /> the noed of any notice to Contractor.
<br /> d) AllinsurancepoliciesunderParagaph28(A)sbellbespecificallyendorsedtoprovidethatthecoverageswillbeprimary �
<br /> and that any insurance carried by any additional insured required under this Paragraph 28(A)shali be exccss or non-contributory.
<br /> B. Buildcr's T2isk
<br /> 1) Contractorshallpurchaseandmaintainpropertyinswanceonthebuildingandmaterials,equipment(exceptContractors'equipmenE �
<br /> es outlined under Parag�aph 28{C)),and supplies at the sife which have been or are to be incorporated into the Projeck Such insurance shalt also include
<br /> those Project materials,equipment,and supplies owned by Owner and stored off-site. 1'his insurance shall include the interests of Owner,Owner's
<br /> mortgagee(if any), the Contractor,Subcontrectors,and Sub-subcontractors in the Work. Such insurance shall be written on an"ail-risk"roplaceme�t
<br /> wst basis. �
<br /> 2) Contractor shall also purchase and maintain boiler and machinery insurance required by the Contract Documents or by law. 'fhis
<br /> insurance shall include the interests of Owner, Owner's mortgage(if any),the Contractor,Subcontractors,and Sub-subcontracwrs in the Work.
<br /> 3) T6e insurance under this Para�aph 28(B)shall not have a deducrible g�eater than�25,000 per occumence,and the Conhactor shall �
<br /> be responsible for payment of said deductible in the event of an insured loss. Contractor waives its rights of recovery against Owner for such deductible.
<br /> Should Contractor elect W increase said deductible,Contractor sE�all be responsible for payment of such increased de�uctible amounts. Contractor shall
<br /> provide a certificate of insurance evidencing such required coverage to the Owner upon request. Any insured loss is to be adjusted with Owner and made '
<br /> payable to Owner as fiduciary for the insureds,as their interests may appear,subject to the requirements of any applicable mortgage clause.
<br /> C. Contractofs Eaaioment Insurance �
<br /> The Contractor shall purchffie and maintain contractor's equipment insurance covering const�uction machinery,equipment,and tools used by the '
<br /> Contractor in the performance of the Work.Such coverage shall be written on a policy form at least equivalent to that provided by a"Contrectots Equipment Floater"
<br /> as customarily defined within the insurance industry. Contractor also a�ees to notify any Subcontractors and Sub-subcontractors of their obligation to insure any
<br /> machinery,equipment,and tools used by t}�e Subcontractors and Sub-subcontractors in the performance ofthe Work.
<br /> D. Indeoendent Obliuetions ,
<br /> The Contractor's insurance obligations wntai�d in this Para�aph 28 are separaie from and in addition to the Contractor's indemnification obligations
<br /> contained in Paragaph 27 of this Contract. '
<br /> 29. SEPARATE COIVTRACCS A1ND MUTUAL RESPONSIBILI'TY OF CON1'RAGTORS
<br /> . A. Construcdon of other phases of the overall Project will be conducted concurrendy with the perfoimance oPthis Contract Accordingly,it shaii �
<br /> be the responsibility ofthe Contractor to fully coordinate its activities with those of a!l other contractors and with the Owner's Representative to effectively prosecute
<br /> the overall completion ofthe Pmject with a minimum amount of interferena and to prevent discrepancies with the continuous Work,and pamit eerty access for
<br /> other trades. It is specificaity understood that other work may be scheduled at the sazne time and in the sasne areac as the Contractor's Work. The Contr-actor shatl
<br /> intelligently administer its contractual obligations and cooperate to the fuUest extent with other contractors. Additionally,the Contractor specifically agrees to �
<br /> coordinate its Shop Ihawings with those of other contractors.
<br /> B. The Contractor sl�all be responsible for the coordmahon of the mstallat�on by the Owner,or�ts contractors,of all fixt�ues and equipment to
<br /> be purchased by the Owner.Toward this e.nd,the Contractor agees to provide access to the Project for the delivery,setting in place and installation of the fumiture,
<br /> fumishings,fixtures,machicery and equipment,in accordance with the Owner's installation schedule,for the Ovmer's exclusive use in such setting in place and �
<br /> installation in addition,the Contractor shall coordinate with the Owners other contractors for the installation of utilities,equipment and fixtures.
<br /> C. The Contiactor shall afford oth�contractors reasonable opportunity for the introducdon and storage oftheir materials and equipment and the
<br /> execution of their work,and shall properly connect and coordinate his Work with theirs. ,
<br /> D. If any part of ihe Contractors Work depends for proper execudon or results upon the wark of any other separate contractor,the Contractor
<br /> shalI inspect and promptly repoR to the Owner's Representative any apparent discrepancies or defects in such wodc thai render it unsuitable for such proper execution
<br /> and results in writing. Failure of the Contractar to so inspect and report shalt constitute an acceptance of the other contractor's work as fit and proper to receive its �
<br /> Work,except as to defeets which may develop in the ConVactor's Work after the execution of the Contracto�s Work.
<br /> E. Should a contractor cause damage to t6e WorEc or property of any other contractor on the Project,the party damaged shall notify the oBending
<br /> contractor in writing of such damage and the offending contractor shall bear the cosf of repairing all such damage. The Owner reserves the right to effectuate the
<br /> repairs and to charge the c�st the�eof against the offending conuactor.The Contractor hereby expressly waives all claims against the Owner for the cost of repairing ,
<br /> damage to the Work caused by other contractors. Contractor he�eby agees to attempt to�solve any issues regarding damage to anod►er conhacWr's work or damage
<br /> to its work caused by another contractor wit6lbe other contractor.
<br /> 30 SUBCONTRACTORS �
<br /> co�,,.�a 00810-i 5
<br /> IS �
<br />
|