Laserfiche WebLink
Construction Contract � <br /> GENERAL CONDITIONS <br /> continuation of such coverage shall be submitted to Ownec ' <br /> c) All insurance policies under Paragraph 28{A}shall not be cance{led or adversely materially changed except afterthirty <br /> (30)days advance written notice to Owner. Upon receipt of any notice of cancellation or adverse material change,Conkactor shall within <br /> ten(10)days procure replac:ement policies of insurance. If Contractor fails to procure aad maintain acceptable policies of insurance in � <br /> accordance with the tecros hereo�then Owner may,at Owrte�'s op6on,obtain such insurance at the cost and expense of Contractor,without <br /> the noed of any notice to Contractor. <br /> d) AllinsurancepoliciesunderParagaph28(A)sbellbespecificallyendorsedtoprovidethatthecoverageswillbeprimary � <br /> and that any insurance carried by any additional insured required under this Paragraph 28(A)shali be exccss or non-contributory. <br /> B. Buildcr's T2isk <br /> 1) Contractorshallpurchaseandmaintainpropertyinswanceonthebuildingandmaterials,equipment(exceptContractors'equipmenE � <br /> es outlined under Parag�aph 28{C)),and supplies at the sife which have been or are to be incorporated into the Projeck Such insurance shalt also include <br /> those Project materials,equipment,and supplies owned by Owner and stored off-site. 1'his insurance shall include the interests of Owner,Owner's <br /> mortgagee(if any), the Contractor,Subcontrectors,and Sub-subcontractors in the Work. Such insurance shall be written on an"ail-risk"roplaceme�t <br /> wst basis. � <br /> 2) Contractor shall also purchase and maintain boiler and machinery insurance required by the Contract Documents or by law. 'fhis <br /> insurance shall include the interests of Owner, Owner's mortgage(if any),the Contractor,Subcontractors,and Sub-subcontracwrs in the Work. <br /> 3) T6e insurance under this Para�aph 28(B)shall not have a deducrible g�eater than�25,000 per occumence,and the Conhactor shall � <br /> be responsible for payment of said deductible in the event of an insured loss. Contractor waives its rights of recovery against Owner for such deductible. <br /> Should Contractor elect W increase said deductible,Contractor sE�all be responsible for payment of such increased de�uctible amounts. Contractor shall <br /> provide a certificate of insurance evidencing such required coverage to the Owner upon request. Any insured loss is to be adjusted with Owner and made ' <br /> payable to Owner as fiduciary for the insureds,as their interests may appear,subject to the requirements of any applicable mortgage clause. <br /> C. Contractofs Eaaioment Insurance � <br /> The Contractor shall purchffie and maintain contractor's equipment insurance covering const�uction machinery,equipment,and tools used by the ' <br /> Contractor in the performance of the Work.Such coverage shall be written on a policy form at least equivalent to that provided by a"Contrectots Equipment Floater" <br /> as customarily defined within the insurance industry. Contractor also a�ees to notify any Subcontractors and Sub-subcontractors of their obligation to insure any <br /> machinery,equipment,and tools used by t}�e Subcontractors and Sub-subcontractors in the performance ofthe Work. <br /> D. Indeoendent Obliuetions , <br /> The Contractor's insurance obligations wntai�d in this Para�aph 28 are separaie from and in addition to the Contractor's indemnification obligations <br /> contained in Paragaph 27 of this Contract. ' <br /> 29. SEPARATE COIVTRACCS A1ND MUTUAL RESPONSIBILI'TY OF CON1'RAGTORS <br /> . A. Construcdon of other phases of the overall Project will be conducted concurrendy with the perfoimance oPthis Contract Accordingly,it shaii � <br /> be the responsibility ofthe Contractor to fully coordinate its activities with those of a!l other contractors and with the Owner's Representative to effectively prosecute <br /> the overall completion ofthe Pmject with a minimum amount of interferena and to prevent discrepancies with the continuous Work,and pamit eerty access for <br /> other trades. It is specificaity understood that other work may be scheduled at the sazne time and in the sasne areac as the Contractor's Work. The Contr-actor shatl <br /> intelligently administer its contractual obligations and cooperate to the fuUest extent with other contractors. Additionally,the Contractor specifically agrees to � <br /> coordinate its Shop Ihawings with those of other contractors. <br /> B. The Contractor sl�all be responsible for the coordmahon of the mstallat�on by the Owner,or�ts contractors,of all fixt�ues and equipment to <br /> be purchased by the Owner.Toward this e.nd,the Contractor agees to provide access to the Project for the delivery,setting in place and installation of the fumiture, <br /> fumishings,fixtures,machicery and equipment,in accordance with the Owner's installation schedule,for the Ovmer's exclusive use in such setting in place and � <br /> installation in addition,the Contractor shall coordinate with the Owners other contractors for the installation of utilities,equipment and fixtures. <br /> C. The Contiactor shall afford oth�contractors reasonable opportunity for the introducdon and storage oftheir materials and equipment and the <br /> execution of their work,and shall properly connect and coordinate his Work with theirs. , <br /> D. If any part of ihe Contractors Work depends for proper execudon or results upon the wark of any other separate contractor,the Contractor <br /> shalI inspect and promptly repoR to the Owner's Representative any apparent discrepancies or defects in such wodc thai render it unsuitable for such proper execution <br /> and results in writing. Failure of the Contractar to so inspect and report shalt constitute an acceptance of the other contractor's work as fit and proper to receive its � <br /> Work,except as to defeets which may develop in the ConVactor's Work after the execution of the Contracto�s Work. <br /> E. Should a contractor cause damage to t6e WorEc or property of any other contractor on the Project,the party damaged shall notify the oBending <br /> contractor in writing of such damage and the offending contractor shall bear the cosf of repairing all such damage. The Owner reserves the right to effectuate the <br /> repairs and to charge the c�st the�eof against the offending conuactor.The Contractor hereby expressly waives all claims against the Owner for the cost of repairing , <br /> damage to the Work caused by other contractors. Contractor he�eby agees to attempt to�solve any issues regarding damage to anod►er conhacWr's work or damage <br /> to its work caused by another contractor wit6lbe other contractor. <br /> 30 SUBCONTRACTORS � <br /> co�,,.�a 00810-i 5 <br /> IS � <br />