Construction Contract �
<br /> GENERAL CONDITIONS
<br /> e) Submival title,drawing number,revision number and datc of drawir�g and revision. �
<br /> � Applicable Contract Drawings and Specification secrion numbers.
<br /> g) Product data submitted wntaining multiple items for approval need the identiflcation oniy on the exterior. In such �
<br /> instances the identification shall include page and caraiog item numbeis.
<br /> 2) SpaOC: Vacant space approximately 2 1/2"higti by 4"wide shall be provided adjacent to the iden6fication data to receive the
<br /> Ovmer's status stamp. �
<br /> G. General
<br /> 1) Sienature:Eac�itemsubmittedshallbetlsoroughlyreviewedbytheContractorandhaveastampornotedescribingtheContractor's �
<br /> actioq sig�ed by the person authorizcd by the Contractor to do the checking wiih that person's name clearly printed.
<br /> 2) Contractor Resnonsibilitv:Contractor shall review each submittal for completeness,conformance to the Conpact Documenu and
<br /> coordination with other partc ofthe Work and the Progress Schedule.By providing and submifting to the Owner or the Owners designee Shop Drawings, �
<br /> product data,warranties and samples,the Contraclor will be deaned to represent that he has detemiined and verified(a)the availability of all materials,
<br /> and(b)field measurements and field construction criteria related thereto,and tbat he has checked and coordinated the information contained within such
<br /> submittals with the requirement of the Work,the Contract Documents and the Pro�ess Schedule and that such Shop Drawings,samples,warranties and
<br /> data conform to the Contract Documents.
<br /> 3) Characteristics Not Checked bv Owner: Acceptance is for general design on1y. Quantities,size,ficld dimensions and locations �
<br /> are some of the required cheracterisdcs which are not part of the Owmer's acceptance and will not be checked. Accordingly,the Owner's limited
<br /> acceptance shall in no way relieve the Contraaor&om his obligation to conform his work to required characteristics and to Project Specifications.
<br /> 4) Delavs: 'It�e Owner may reWrn incomplete submittaIs wich no action taken. 'The Contractor shalf have no claim for any damages �
<br /> or for an extension of time due to delay in the Work resulting from the rejection of materials or from the rejectian,cort�ection,and resubmittal of Shop
<br /> Drawings,samples and other dats�or from the untimely submission lhereof.
<br /> 18. PROJECT RECORD DOCUMEN75 �
<br /> A. The Contractor shall maintain at the job site,unless otherwise directed by the Owne�s RepresentaNve,copies of all Drawings,Specificaiions,
<br /> Addenda,Shop Drawings,Changes of Contracx,Change Directives,other contract moditications and other doeuments subm9Ued'm compliance with the Contract �
<br /> Documents. �
<br /> B. The Contractor shall check all sections of the Specifications for specific references to maintaining record drawings and diagrams(the"Project
<br /> Record Documents"). These references are int�ded to clarify record documentation for particular items and are not intended to limit requirements generally.
<br /> C. The Contractor shall ensure that eac6 ofth�Project Record Documents shall be clearly marked"Project Record Copy"and shall be maintained `
<br /> in good condition and available at all times for inspection by the Owner's Representative. The Contractor shall mark up the most appmpriate documents to r�ord
<br /> significant changes during the construction process and signifcant details not shown in the original Contract Documents.
<br /> D. The Contractor shall�sur�e that the information given shall include,but not be limited to,the actua)location of the undergrouad utiiities and '
<br /> appuRenances,referenced to permanent surface improvements. Also,the location of internal piping,wiring,ductwork,conduit and appwtenances concealed in
<br /> building structures,referenced to visible and accessible features of the structures. Projeci record documents are to be kept current, No Work shall be permanenUy
<br /> concealed until the mquired information h�been recorded. �
<br /> E. At the completion of tfie Project,the Oamer's Itepresentative will fumish the Contractor with a complete set of curnent Contract Drawings.
<br /> The Contractor shall transfer the recorded chenges to the dsawings neatly with a permanent line of sufficient weight to cleariy show ffie record changes. The
<br /> ConUactor shall stamp and sign a certification statement on each Drawing and page that the Drawings as submitted are correct and accurately depict the Work as �
<br /> it has bxn consweted. These drawings(the"As-Built Drawings")sha�l be submitted to the Owner prior to Acceptance of the Project by the Owner end prior to
<br /> the release of the Contractor's Final Payment
<br /> 19. CLEAl�t-UP
<br /> A. Dailv Clean-Uu �
<br /> 1) The ConVactor shali pmvide for all clean-up and off-site disposal of all hash and debris as required by the Ovmer.The Contractor
<br /> shall pmvide whatever manpower and equipment(including,but not limibed to,dumpsters)that the Owncr's Representative,in its sole discretiot►,&els ,
<br /> is necessary to adequatety clean and remove from the Conswction site all trach,diR and debris that results from the operations of the Contractor,his
<br /> Subcontractors and Suppliers,and Owner-fumished material installed by the Conhacta.
<br /> 2) Allequipmentortempo�aryfacilitiesprovidedormaintainedbytheContractorshallberemovedfromtheProjectnolaterthanFinal
<br /> Completion. However,prior to Final Completion,the Contractor shall remove or relocate such equipment or temporary facilities within 72 hours of its ,
<br /> receipf of notice to do so by the Ovmer.
<br /> 3) If the Con�actor fails to clean up as provided in this Paragraph,the Owner reserves the dgt�t,upon forty-eight(48)hows written
<br /> notice to the Contractor,to procced to remave the debris,the cost of which witl be charged against the Contractor. '
<br /> ca�ra.�a 00810-9
<br /> 9 �