Laserfiche WebLink
Construction Contract � <br /> GENERAL CONDITIONS <br /> e) Submival title,drawing number,revision number and datc of drawir�g and revision. � <br /> � Applicable Contract Drawings and Specification secrion numbers. <br /> g) Product data submitted wntaining multiple items for approval need the identiflcation oniy on the exterior. In such � <br /> instances the identification shall include page and caraiog item numbeis. <br /> 2) SpaOC: Vacant space approximately 2 1/2"higti by 4"wide shall be provided adjacent to the iden6fication data to receive the <br /> Ovmer's status stamp. � <br /> G. General <br /> 1) Sienature:Eac�itemsubmittedshallbetlsoroughlyreviewedbytheContractorandhaveastampornotedescribingtheContractor's � <br /> actioq sig�ed by the person authorizcd by the Contractor to do the checking wiih that person's name clearly printed. <br /> 2) Contractor Resnonsibilitv:Contractor shall review each submittal for completeness,conformance to the Conpact Documenu and <br /> coordination with other partc ofthe Work and the Progress Schedule.By providing and submifting to the Owner or the Owners designee Shop Drawings, � <br /> product data,warranties and samples,the Contraclor will be deaned to represent that he has detemiined and verified(a)the availability of all materials, <br /> and(b)field measurements and field construction criteria related thereto,and tbat he has checked and coordinated the information contained within such <br /> submittals with the requirement of the Work,the Contract Documents and the Pro�ess Schedule and that such Shop Drawings,samples,warranties and <br /> data conform to the Contract Documents. <br /> 3) Characteristics Not Checked bv Owner: Acceptance is for general design on1y. Quantities,size,ficld dimensions and locations � <br /> are some of the required cheracterisdcs which are not part of the Owmer's acceptance and will not be checked. Accordingly,the Owner's limited <br /> acceptance shall in no way relieve the Contraaor&om his obligation to conform his work to required characteristics and to Project Specifications. <br /> 4) Delavs: 'It�e Owner may reWrn incomplete submittaIs wich no action taken. 'The Contractor shalf have no claim for any damages � <br /> or for an extension of time due to delay in the Work resulting from the rejection of materials or from the rejectian,cort�ection,and resubmittal of Shop <br /> Drawings,samples and other dats�or from the untimely submission lhereof. <br /> 18. PROJECT RECORD DOCUMEN75 � <br /> A. The Contractor shall maintain at the job site,unless otherwise directed by the Owne�s RepresentaNve,copies of all Drawings,Specificaiions, <br /> Addenda,Shop Drawings,Changes of Contracx,Change Directives,other contract moditications and other doeuments subm9Ued'm compliance with the Contract � <br /> Documents. � <br /> B. The Contractor shall check all sections of the Specifications for specific references to maintaining record drawings and diagrams(the"Project <br /> Record Documents"). These references are int�ded to clarify record documentation for particular items and are not intended to limit requirements generally. <br /> C. The Contractor shall ensure that eac6 ofth�Project Record Documents shall be clearly marked"Project Record Copy"and shall be maintained ` <br /> in good condition and available at all times for inspection by the Owner's Representative. The Contractor shall mark up the most appmpriate documents to r�ord <br /> significant changes during the construction process and signifcant details not shown in the original Contract Documents. <br /> D. The Contractor shall�sur�e that the information given shall include,but not be limited to,the actua)location of the undergrouad utiiities and ' <br /> appuRenances,referenced to permanent surface improvements. Also,the location of internal piping,wiring,ductwork,conduit and appwtenances concealed in <br /> building structures,referenced to visible and accessible features of the structures. Projeci record documents are to be kept current, No Work shall be permanenUy <br /> concealed until the mquired information h�been recorded. � <br /> E. At the completion of tfie Project,the Oamer's Itepresentative will fumish the Contractor with a complete set of curnent Contract Drawings. <br /> The Contractor shall transfer the recorded chenges to the dsawings neatly with a permanent line of sufficient weight to cleariy show ffie record changes. The <br /> ConUactor shall stamp and sign a certification statement on each Drawing and page that the Drawings as submitted are correct and accurately depict the Work as � <br /> it has bxn consweted. These drawings(the"As-Built Drawings")sha�l be submitted to the Owner prior to Acceptance of the Project by the Owner end prior to <br /> the release of the Contractor's Final Payment <br /> 19. CLEAl�t-UP <br /> A. Dailv Clean-Uu � <br /> 1) The ConVactor shali pmvide for all clean-up and off-site disposal of all hash and debris as required by the Ovmer.The Contractor <br /> shall pmvide whatever manpower and equipment(including,but not limibed to,dumpsters)that the Owncr's Representative,in its sole discretiot►,&els , <br /> is necessary to adequatety clean and remove from the Conswction site all trach,diR and debris that results from the operations of the Contractor,his <br /> Subcontractors and Suppliers,and Owner-fumished material installed by the Conhacta. <br /> 2) Allequipmentortempo�aryfacilitiesprovidedormaintainedbytheContractorshallberemovedfromtheProjectnolaterthanFinal <br /> Completion. However,prior to Final Completion,the Contractor shall remove or relocate such equipment or temporary facilities within 72 hours of its , <br /> receipf of notice to do so by the Ovmer. <br /> 3) If the Con�actor fails to clean up as provided in this Paragraph,the Owner reserves the dgt�t,upon forty-eight(48)hows written <br /> notice to the Contractor,to procced to remave the debris,the cost of which witl be charged against the Contractor. ' <br /> ca�ra.�a 00810-9 <br /> 9 � <br />