|
Construc�ion Contract �
<br /> GENERAL CONDITION$
<br /> i. scoP� �
<br /> This section defines the General Conditions governing the perfamance of the Construaion Condact
<br /> 2. DEFINI'I'IONS �
<br /> A. ADDENDA:Any written or graphic instrumerst issued prior to the opening of bids which darifies,coRects,or changes nny part ofthe bidding
<br /> documents or the Contract Documents.
<br /> B. GHANGE DIRECTIVE: A written order to procced wiffi Work executed and issued by the Authorized Representative of the Qwner. �
<br /> C. CHANGE QF CONT'RACT: A written order issued after the effective daie of the Conuact by the Authorized Representative of the Own�
<br /> which authorizes an addition,detetion or revision in the Work and which may include an adjustment in the Contract Sum or the Contraci Time. �
<br /> A. CONTRACT:That certain doaunent,end all ofits schedules,exhibits and subsequent artiendmertts,which defines the scope ofihe ConFractor's
<br /> Work and specifies the Contract Sum.
<br /> E. CON'IRACT DOCUMEN7'S: The Contract Documents are as defined in the Contract between the Owner and the Contractor. The Contract �
<br /> Documents embody the entire and integrated agreement between the parties herew and supecsede all prior communications,negotiations,representations or
<br /> ageements,cither written or oral.
<br /> F. CONTRACTOR: The person or organization identified as such in the Contract thaE is contracted by the Owner to complete all or a certain �
<br /> poRion of the Work required for the conshvction and completion of the Projeck
<br /> G. T)AY: Unless otherwise specified,the words"day"or"days"shall mean calendar day or calendar days.
<br /> H. DRAWIIdGS_The drawings which show the cbaracter,nature and scope ofthe Work to be performed and which are refemed to in the Contraet �
<br /> Documents.
<br /> I. MODIFICATION: A"modification"is(1)a writien amendment to the Contract signed by both parties,(2)a Change of Contract issued �
<br /> pursuant to Article 19 hereof,(3)any written interpretation,clarification or amplification issued by the Owner pursuant to the terms hereof which alters the Contract
<br /> Sum or change the Contract Time,or(4)a wriuen order issued by the Owner pursuant to Article 19 hereof.
<br /> J. NOTICE TO PROCEED:A written notice given by thc Owner to the Coatractor fixing the date on which the Conkact Time will commence �
<br /> to run and on which Contractor shall start W perform Contractots obligations under the Conhsct Documents.
<br /> K. PRODUCT DATA: Dlustrations,standard schedules,perforsnance charts,instruc6ons,brochures,diagrams or other infonnation fumished
<br /> by the Conuactor to illustrate a materiai,product or system for some portion of the Work. ,
<br /> L. PROJECT: 7he total conswction of which the Work performed urid�the Contract Documents may be the whole or a part.
<br /> M. SAMPLES:Physical examples fumished by the Contractorwhich illustrate materials,equipmerrcaworkmanship and,ifin conformance with
<br /> the Contract Documents,establish the standard by which the Work will be judged. �
<br /> N. SHOP DRAWINGS: Drawings,diagrams,illustratioas,schedules or other data which are specifically prepared by or for the Contractor W
<br /> illustrate some portion of the Work and all illustrations,brochures,stendard schedules,performance charts,specifications, instructions,diagrams.and other
<br /> information preparod by a supplier and submitted by ContracWr to i1lusVate material or equipment for some portion of the Work. �
<br /> O. SPECIALPROVISIONS:ThatpartofiheContractDoc►�meatswhichamendsorsupplemenfstheseGeneralConditionsandothermquirements
<br /> of the Conlract Documents.
<br /> P. SPECIEICATIONS: Those portions of the Con�act Docuncents consisting of written technical descriptions, provisions or reyuirements '
<br /> pertaining to the matcrials and workmm�ship applicable to the Work to be perfotmed under the Contract Documents,including,but nat limited to,the quantities or
<br /> quality of materials,equipment,construction systems or applications.
<br /> Q. SUBCON'I'RACCOR:ThosehavingadirectcontractwiththeContractor{oranywholly-ownedoraffiliatedenNtythereo�toperformaportion �
<br /> of the Work or providc materials for the Project
<br /> R. SUBSTANTIAL COMPLEI�ON: The completion of the Work to the point that the Owncr could open the Project to the general public for
<br /> business,that is,that it is suitable for the functions for which it was intended in a commeroially satisfactory manner. �
<br /> S. SUB-SIiBCONTRACTOR Any person other than a Contractor or a Subcontractor(or any wholly�wned or affiliated entity thereo�who
<br /> supplies labor or materials to the Project for work wiUtin the Contractor's Scope of Work regardless of how remote that person's contract is from t6e Owner.
<br /> T. SUPPLIER: Any party supplying,by sale or lease,diroctly or indirectly,any materials or cbnstruction equipment for the Coniractor's Wodc �
<br /> and includes distributors,materialmen,vendors and menufacturcrs.
<br /> U. WORK: All tabor,mataials(except mat�ials spceified or noted to be fumished by the Owner),equipment,supplies,permits,licenses, �
<br /> insurance and services necessary for and reasanabty incidental W the completion ofthe Contractor's obligatioas heneunder in socordance with the Conuact Documents.
<br /> c�,�,.�a 00810-1 �
<br /> 1
<br />
|