Laserfiche WebLink
8. GUARANT'EE � <br /> 8.1 The Contractor herehy guarantees all work,materials,equipment, etc.,specified herein,indicated on <br /> the drawings,or approveci and/oc incorporated into the work for a period equivalent to one(1)year of � <br /> actual operation and norcnal use after the date of acceptance or benefcial occupancy of the premises by <br /> the Owner,wlzich ever occurs fust. <br /> 8.2 The Contractor agrees to maice aIl necessary repairs to or replace any item of material or equipment � <br /> or part thereof which as proven defective(not due to misuse or improper care)within the stated period, <br /> free from any cost of abrogate other specified guarantees or the usual guarantees against the work, � <br /> materials,or items of equipment that were defectiva when supplied or improperly cared for or protected <br /> during the period of construction. <br /> SPECYAL PROVISIONS: �� <br /> TEMPORARY LIGHTIl�TG AND PO WER � <br /> 1.The Electrical Contcactor sha11 fumish and instail temporary service and temporary lighting <br /> adequate for normal operations of all trades. <br /> 2.The Electrical Contractor shatl insure that power to the existing residence is not interrupted � <br /> during the entire construction period. <br /> UTILITY COMPANY CHARGES � <br /> 1.All utility company installation charges(including temporary service charges)to be paid by <br /> Owner. <br /> 1NIRE � <br /> I Non-meta.ilic wiring and aluminum wire may be used where permitted by code except that the <br /> only aluminum wire that may be used on circuits fused at less than 30 AMPS is copper clad. � <br /> DEVICES <br /> 1.A11 devices to be residential grade,white color,mounted at heights common to residential• � <br /> work. <br /> EQUIPMENT WIltING � <br /> i. Each uni#to have ground fault protection in bathroom an�d outdoors per code. Ground <br /> fault interrupter receptacle to be fumished by Electrical Contractor. <br /> 2. Verify with Architect any requirements for CO and Smoke Detectors.These items shall ` <br /> be furnished by Electrical Contractor upon the approval of the architec� <br /> 3. Wire for fans,fiunace and other devices shown on the drawings or requestredby the � <br /> Owner (All furnished by Owner). <br /> BASIC METHODS ArTD MATERIALS . � <br /> 1. PANELBOARDS <br /> Existing Panelboard shall used. � <br /> 2. GROUNDING <br /> The service neutral and service equipment shall be connected to the water main with copper wire. � <br /> 3. WIRING DEVICES <br /> 1.Ail wiring devices shall be intermediate gade and in generai,flush mounted. � <br /> ELECTRICAL WORK Page 2 of 3 <br /> � <br />