Laserfiche WebLink
, <br /> D. Wiring Diagram: Submit wiring diagrams for each electric product specifted. � <br /> 1. Verify voltage with electrical Contractor. � <br /> E. Templates: Suhmit templates and "reviewed Hardware Schedule"to door and frame <br /> supplier and others as applicable. <br /> F. Samples: � <br /> 1. If requested by Architect,provide 3 sampies of inetaI fmishes. � <br /> G. Keying$chedule: Upon review and acceptattce of Hardware Schedule,develop Keying <br /> Schedule in consultation with Owner. <br /> 1. Submit 1 copy to Architect far information only. � <br /> H. Contract Close-out Submittals: Comply with Section 01700 including specific � <br /> requirements. <br /> 1. Operating and maintenance manuals: Submit 3 sets containing the following: <br /> a. Maintenance instructions for each item of hardware. M <br /> b. Catalog pages for each produc� <br /> c. Name,address,and phane number of Iocal representative for each mannfacturer. <br /> d. Parts list for each product. � <br /> e. Copy of final hazdware schedule. <br /> f. Copy of final keying schedule. <br /> 1.44 QUALITY ASSURANCE � <br /> A. Manufacturer's Qualifications: Not less than 5 years experience in the actuai <br /> production of specified products. � <br /> B. Distributor's Qualifications: <br /> 1. Fum with 3 years.axperience in the distribution of commercisl hazdware. � <br /> 2. Distributor to employ full time Architectura!Hardware Consultant for the <br /> purpose of scheduling and coordinating hardware and establishing keying <br /> schedule. � <br /> 3. Hardware Schedule shail be prepared and signed by an AHC. <br /> C. Installe�'s Qualifications: <br /> 1. Thuree(3) years experience in instai�ation of similar hazdwaze to that required � <br /> for this project. <br /> D. Regulatory Label Requirements: Provide UL label or stamp on hardware required on � <br /> labeled doors. <br /> 1 AS DELIVERY, STORAGE,AND HANDLING � <br /> A. Packing and Shipping: <br /> 1. Deiiver products in original unopened packaging with legible manufacturer's � <br /> identification. <br /> 2. Package hardware to prevent damage during hansit and s#ora�e. <br /> 3. Mark hardware to correspond with"reviewed Hardware Schedule" � <br /> DOOR HARDWAR,E Page 2 of 5 � <br />