My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-00301 - addn/remodel/repair
Orono
>
Property Files
>
Street Address
>
G
>
Glendale Cove Lane
>
2325 Glendale Cove Lane - 34-118-23-33-0065
>
Permits/Inspections
>
2015-00301 - addn/remodel/repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:57:00 PM
Creation date
7/26/2018 3:00:06 PM
Metadata
Fields
Template:
x Address Old
House Number
2325
Street Name
Glendale Cove
Street Type
Lane
Address
2325 Glendale Cove Lane
Document Type
Permits/Inspections
PIN
3411823330065
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,, o <br /> � �-Cl� � 1� N�O� V�''� �l� �r�1�G � N�F E R S <br /> � , _ _ � .. <br /> CRITERIUM-SCHIMNOWSKI ENGINEERS <br /> 161 DUNBAR WAY <br /> MAHTOMEDI,MN 55115 <br /> TEL 651779-7700 <br /> FAX 651 779-7114 <br /> www.criterium-schimnowski.com <br /> September 19,2014 <br /> Aaron Madson <br /> Natural Creations Inc. <br /> 5700 Vagabond Lane North <br /> Plymouth,MN 55446 <br /> RE: Boulder Retaining Wall Evaluation <br /> 2325 Glendale Cove Lane <br /> Orono,Minnesota <br /> Project No. 14-1413 <br /> Deaz Mr.Madson: <br /> This letter is being sent per your request for an evaluation of the boulder retaining wall construction at the <br /> 2325 Glendale Cove Lane project in Orono,Minnesota. This evaluation is based on verbal infonnation <br /> and project photos provided on September 15,2014(see attached phatos). <br /> The construction of the retaining walls appears to be str�cturally stable and in general conformance with <br /> boulder retaining wall and construction industry standards. The walls were constructed with boulders of <br /> sufficient size and setback. Other typical construction details such as use of drainage elements and filter <br /> fabric also appeared to be followed correctly. As is normal for boulder retaining walls of this type,some <br /> wall movement and soil settlement should be expected. <br /> I recommend that gutters and downspouts be installed and maintained on the house in order to direct the <br /> roof runoff away from the retaining wall. Concentrated areas of surface water should also be directed <br /> away from the walls. <br /> This evaluation was performed using the design guidelines presented in the third edition of the"Design <br /> Manual for Segmental Retaining Walls"(DMSRV�published by NCMA in 2009. If soil conditions, <br /> proposed layouts,or other design parameters vary from that assumed a revised analysis might be needed. <br /> Please call me if you have any questions or need more information. Thank you. <br /> Sincerely, <br /> � � ` . _ <br /> � <br /> Paul Schimnowski,PE <br /> LICENSED <br /> P ENGINEE S� RECEIVED <br /> HOME&BUILDING INSPECTIONS �OV — 7 LO�4 <br /> STRUCTURALEVALUATIONS <br /> ASSOCIATION RESERVFJTRANSITION STUDIES <br /> RESIDENTIAUCOMMERCIAL CITY OF ORONO <br /> RETAINING WALL DESIGN&EVALUATIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.