Laserfiche WebLink
JUN-1�-1998 08:04A FROM: T0:9522494616 P:3�19 <br /> Dan Sonn.en Report Cont. 7���08 <br /> Therefore on 7/2/08 another alternate site was tested to determine <br /> what type of drainfield could be instelled and still comply with the <br /> current codes. <br /> The three soil borings indicated the following results; <br /> Sail Boring 4A Mottied soil at 24 inches and no standing water <br /> Soil Boring SA " " " 13 inches " " " " <br /> Soil Boring 6A " " " 20 inches " " " " <br /> The average percolation ra.te was 36.1 rixin/in. <br /> Therefore with the above information a standard mound system <br /> could be installed in tlus alternate site if needed in the future. <br /> However the system that was design for the prunary site on <br /> 5/23/08 should be used for this house and the new alternate site <br /> should be designated as a futyire site. <br /> Both sites must be �oped off�o prevent construction traffic from <br /> compacting the soil which wi`1 result in ruining the sites . <br /> This report should be added t� the one dated 5/23/08 . � <br /> ; <br /> S�'te Eva1 tar <br /> � � C.1r %�� � <br /> + V- C �+�%�l <br /> ; <br /> RQbert A. Koch M.P.C.A. 1931I429 <br /> � <br /> ; <br />