Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
. � �°� <br /> � ��� � Principal Dwelling Demolition Permit <br /> ��� <br /> � ,��`�r��� �F ZONING DISCLOSURE & DECLARATION <br /> ���� �.G <br /> �o� <br /> To the property owner: Demolition of the principal dwelling structure on a property may <br /> automatically terminate certain rights which may have accrued to the property by virtue of the continued <br /> existence of that building. <br /> • Rebuilding on a substandard lot of record (i.e. a lot that does not meet the zoning district required lot area or width <br /> standards)will,with few exceptions,require variance approval by the City Council,and such approval is not automatic or <br /> guaranteed but requires that a hardship be demonstrated. <br /> • Additionally,all current zoning standards will have to be met by the new principal dwelling including setbacks,lot coverage <br /> by structures, hardcover(impervious surface), height limits, etc. <br /> • Where municipal sewer is not available, provision of two (2) sites for a conforming on-site sewage treatment system is <br /> mandatory. <br /> • Unless specifically approved by the City, all accessory structures must be removed at the time of principal dwelling <br /> demolition.This also applies to seasonal and permanent docks,which may not be re-installed until a new principal dwelling <br /> has reached the framing stage. <br /> The following information is presented for the purposes of advising the property owner of the implications of removal of the principal <br /> dwellin on the ro e <br /> 1. Property Address: 585 Brown Road South PIN # <br /> Required Lot Area 2 ac. (non Required Lot Width 200' <br /> wetland) <br /> 2. Zoning District: RR-1 B app. 7 ac., extent <br /> Actual Lot Area of wetland Actual Lot Width 289' <br /> unknown <br /> Lot area variance mav be required. Lot width variance is 's not r quired. <br /> 30', also <br /> Front Rear Side SubjeCt to Side Street <br /> 3. Required Setbacks: 50' 50' wetland 50' <br /> (Fox) (North) (West) and creek (Brown) <br /> setbacks <br /> Lakeshore Lot: Lake(Front) Street(Rear) <br /> Average Lakeshore Setback: must be me is not a licable. <br /> 4. Lot Coverage by Structures: limited to 15% of lot area/ oes not a I lot area>2 acres <br /> 5. Hardcover limitation • are applicable/ re not applicable. 0-75'zone= 0%allowed <br /> 75-250'zone=25%allowed 250-500'zone=30%allowed 500-]000'zone=35%allowed <br /> 6. Municipal sewer is available.✓ Municipal sewer is not available; on-site system testing and design must be <br /> provided confirming that two conforming drainfield sites are available. (Existing system must be replaced before 12/31/2010 if not <br /> before) <br /> 7. ✓ Wetland(s)present. Wetland is classified as"Preserve". A 50' buffer from the edge of wetland and a 20' structure <br /> setback from the buffer is required. Talk to Planning Department Staff for additional requirements. <br /> The undersigned property owner hereby acknowledges receipt of the above information. Staff Initials <br /> Property Owner's Signature Date <br /> Form ZDD—Revised 5-23-OS (Original:Strect File; Copy:Property Owner) <br />