Laserfiche WebLink
� w . <br /> . , <br /> ` � � <br /> REQUEST FOR COUNCIL ACTION <br /> DATE: October 11, 1999 <br /> ITEM NO.: <br /> Department Approval: Administrator Reviewed: Agenda Section: <br /> Name Gregory A. Gappa Engineer's Report <br /> Title Director of Public Services <br /> Item Description: Request for Sanitary Sewer 480 Russell Avenue <br /> We have received a request from the property owner at 480 Russell Avenue for connection to <br /> sanitary sewer. This properry is located adjacent to the northeast comer of the Minnetonka Bluffs <br /> sewer project. There is an existing sewer in Russell Avenue at the southwest corner of the <br /> property. This property is an existing developed lot with a noncompliant septic system. There <br /> are no septic sites available on the property, as the house is located on a hill surrounded by steep <br /> slopes. This properry meets the criteria for use of one of the 50 sewer units available from the <br /> 1996 MUSA expansions comprehensive plan amendment. <br /> The 1999 connection charge for hookup to the Minnetonka Bluffs sewer project is $10,930. There <br /> are two possible options available for sewer connection. One option would be for connection to <br /> the property at the southeast corner, and installation of a sewer service through the southern <br /> portion of the property. The other option would be to extend the sewer north on Russell Avenue <br /> to the property line. This would require extension of an 8" sewer line and a manhole at the end <br /> of the public sewer. We are recommending that City Engineer approval be required for sewer <br /> connection plans and that construction inspection be required for any work in the public right of <br /> way. The property owner will be responsible for all costs associated with the sewer connection. <br /> COUNCIL ACTION REQUESTED: <br /> Motion to approve use of one sewer unit for connection of 480 Russell Avenue to sanitary sewer <br /> with the property owner responsible for all costs associated with hookup, including the <br /> connection fee for the Minnetonka Bluffs sewer project, and City Engineer plan approval <br /> required. <br />