Laserfiche WebLink
. <br /> �. r. <br /> 640 Old Long Lk.Rd. <br /> Orono <br /> (2) <br /> Keep all heavy equipment off of the proposed treatment area before and <br /> after construction. The treatment area should be marked off before <br /> construction. This Design is not valid & the System will need to <br /> be relocated if failure to protect the areas proposed for"On-Site <br /> Sewage Treatment occurs. � <br /> With proper installation and maintenance, this system should have no <br /> problem in treating septic effluent effectively. <br /> Recommend to pump the septic tank every year if there is only 1 tank <br /> & every 2 years if there are 2 tanks. , <br /> �_� � C�...�_ <br /> Steven B. Schirmers DS <br /> SBS/ds <br />