My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1991-003699 - septic system
Orono
>
Property Files
>
Street Address
>
R
>
Ruann Road
>
380 Ruann Road - 36-118-23-32-0008
>
Septic
>
1991-003699 - septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:02:52 PM
Creation date
7/25/2018 12:16:10 PM
Metadata
Fields
Template:
x Address Old
House Number
380
Street Name
Ruann
Street Type
Road
Address
380 Ruann Road
Document Type
Septic
PIN
3611823320008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF ORONO Permit # <br /> - S�PTIC SYSTEM APPROVAL Fee $ <br /> Entered By <br /> The General Contractor wil 1 be given a copy of this report and is <br /> responsible for its distribution to all sub-contractors. S$PTIC SYSTEM <br /> DESIGN IS NOT CONSIDERED AS APPROVED IINLESS THIS SHEET IS ATTACHED. <br /> LOCATION: .�Z� l`iL�'l�/1 /�r ���T� C�E�'` �'� L.�'�"t' KO( � <br /> GF.NF.RAT CONTRACTOR: P$��' <br /> SEPTIC CONTRACTOR: pH��' <br /> OWNER: �1 1�/7't>�.1L�'3L`C�� r''� -PHONE: <br /> � APPROVED <br /> � CONDITIONALLY APPROVED: (Note Changes Below) <br /> �o�Ts:�,��-�� _ T��.� l a�� �- �o� �ii�,.� <br /> � � �� � <br /> � <br /> � <br /> , � ^ � <br /> _ , �- . <br /> NOTICS TO INSTAI.LBRS: Anv changes to the approved plans and specs must have prior <br /> approval of the Inspector (�73-7357). Call for inspections 24 hours in advance. <br /> NOTIC$ TO GSNSRAL COFTRACTORS: Primary and alternate drainfield sites MIIST be protected <br /> prior to and after system installation to avoid compaction of the natural soil. <br /> a�,T ��ygi T�TW �p�c M�gT g?r ug�� �FF gr�or to building site excavation and fencing must <br /> remain in piace until finai site grading. Approval to pour foctings will not be granted <br /> until the Inspections Department has verified that primary and alternate sites are <br /> adequately protected. <br /> PO VSHICIII.AR TRAFFIC OF AAY RIND (cars, trucks, earth moving equipment, etc.) is allowed <br /> within 20' of tested drainfield sites either before or after system construction. This <br /> applies to the lot you are working on and all adjacent lots. You couid be held liable for <br /> damaging sites on neighboring lots. <br /> VSHICIILAR TRAFFIC CAN CAIISB SOIL COMPACTIOB, RBPDSRIPG DRAINFISLD SITES IIAIISABLS. <br /> Evidence of traffic on drainfield sites may be cause for revocation of building permits. <br /> Damaged alternate sites must be replaced before a Certificate of Occupancy wi11 be issued. <br /> , G' <br /> � .�,-�--- <br /> Date Ap ov d By ity of Orono <br />
The URL can be used to link to this page
Your browser does not support the video tag.