My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: sewer system
Orono
>
Property Files
>
Street Address
>
R
>
Ruann Rd
>
360 Ruann Rd - 36-118-23-32-0009
>
Correspondence
>
Re: sewer system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:02:55 PM
Creation date
7/25/2018 11:42:05 AM
Metadata
Fields
Template:
Address
House Number
360
Street Name
Ruann
Street Type
Road
Address
360 Ruann Road
Document Type
Correspondence
PIN
3611823320009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f /' <br /> .J �� C�� ��-Uj �����r� � � c� <br /> � <br /> �� <br /> \� <br /> � ���� � . <br /> �i O O`` � -� <br /> '�,'� .� ��, �r���:- : �, ''�� CITY of ORONO <br /> '��,' ,r ��'` .�1�x � ,�ti,��� Municipal Offices <br /> \.� � �; �.�t;y � <br /> 4.� Street Address: Mailing Address: <br /> �����Eg�;�� 2150 Kelley Parkway P.O. Box 66 <br /> ' Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> October 21, 2003 <br /> Dear Neighborhood Residents; <br /> A pressure sewer system is cunently bein� installed in �-our neighborhood. This sewer system is <br /> available for hookup by neighborhood residents on a�•oluntary basis at this time. Y"ou can continue <br /> to use your existing septic system until the system fails or is required to be replaced because of it's <br /> nonconforming status. The present deadline for the replacement of non conformin� septic systems <br /> is 2010. A conforming septic system can continue to be used until it either fails or is rendered <br /> nonconforming by future septic regulations. <br /> � ��� <br /> The sewer connection fee is currentl�� $6,500 and w-ill be adjusted for inflation on an annual basis. <br /> This connection fee can either be paid before connection to the sewer system or be assessed over a <br /> 15-year time period at a 6.25% annual interest rate. A signed assessment waiver c�zll be required if <br /> you request to be assessed for the connection fee. <br /> In addition to the connection fee,there is a one time SAC fee of$1,275. This SAC fee increases on <br /> an annual basis and is payment for the additional costs of the future downstream capacity in the <br /> Metropolitan Council Sewer System. <br /> This pressure sewer system requires that each propem- owner install and maintain their own <br /> individual grinder pump station. A"progressive caviri�"grinder pump will be required,and the City <br /> needs to approve the pump that�vill be installed to ensure compatibility with the se�z-er system. The <br /> estimated property owner costs for the grinder pump station, service connection, and septic tank <br /> abandonment can range from$7,000 to $12,000 dependinQ on the length of the service connection <br /> required. The City's current flat rate user charge for residential sewer is approsimately $90.00 per <br /> quarter. <br /> Page 1 <br /> Telephone(952)249-4600 • Fax(952)249-4616 <br /> www.ci.orono.mn.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.