Laserfiche WebLink
f /' <br /> .J �� C�� ��-Uj �����r� � � c� <br /> � <br /> �� <br /> \� <br /> � ���� � . <br /> �i O O`` � -� <br /> '�,'� .� ��, �r���:- : �, ''�� CITY of ORONO <br /> '��,' ,r ��'` .�1�x � ,�ti,��� Municipal Offices <br /> \.� � �; �.�t;y � <br /> 4.� Street Address: Mailing Address: <br /> �����Eg�;�� 2150 Kelley Parkway P.O. Box 66 <br /> ' Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> October 21, 2003 <br /> Dear Neighborhood Residents; <br /> A pressure sewer system is cunently bein� installed in �-our neighborhood. This sewer system is <br /> available for hookup by neighborhood residents on a�•oluntary basis at this time. Y"ou can continue <br /> to use your existing septic system until the system fails or is required to be replaced because of it's <br /> nonconforming status. The present deadline for the replacement of non conformin� septic systems <br /> is 2010. A conforming septic system can continue to be used until it either fails or is rendered <br /> nonconforming by future septic regulations. <br /> � ��� <br /> The sewer connection fee is currentl�� $6,500 and w-ill be adjusted for inflation on an annual basis. <br /> This connection fee can either be paid before connection to the sewer system or be assessed over a <br /> 15-year time period at a 6.25% annual interest rate. A signed assessment waiver c�zll be required if <br /> you request to be assessed for the connection fee. <br /> In addition to the connection fee,there is a one time SAC fee of$1,275. This SAC fee increases on <br /> an annual basis and is payment for the additional costs of the future downstream capacity in the <br /> Metropolitan Council Sewer System. <br /> This pressure sewer system requires that each propem- owner install and maintain their own <br /> individual grinder pump station. A"progressive caviri�"grinder pump will be required,and the City <br /> needs to approve the pump that�vill be installed to ensure compatibility with the se�z-er system. The <br /> estimated property owner costs for the grinder pump station, service connection, and septic tank <br /> abandonment can range from$7,000 to $12,000 dependinQ on the length of the service connection <br /> required. The City's current flat rate user charge for residential sewer is approsimately $90.00 per <br /> quarter. <br /> Page 1 <br /> Telephone(952)249-4600 • Fax(952)249-4616 <br /> www.ci.orono.mn.us <br />