Laserfiche WebLink
� , <br /> J � � lJ� C��`i Y`� �� Pa� <br /> i� 0 <br /> i � � - <br /> � � . <br /> �, � 0 '�� <br /> '� , �;�. ' CITY of ORONO <br /> ,� �# - � <br /> ,. <br /> l` <br /> a� �?` E�r Munici al <br /> ':� �,- ��, _� ��, �... �� „ p off'ices <br /> ��..��..� .� C p �r <br /> ��' .�y/� Street Address: Mailing Address: <br /> �����EggO� 2750 Kelley Parkway P.O. Box 66 <br /> — Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> October 21, 2003 <br /> Dear Neighborhood Residents; <br /> A pressure sewer system is currently bein� installed in ��our neighborhood. This sewer system is <br /> available for hookup by neighborhood residents on a��oluntary basis at this time. �"ou can continue <br /> to use your existing septic system until the system fails or is required to be replaced because of it's <br /> nonconforming status. The present deadline for the replacement of non conformin� septic systems <br /> is 2010. A conforming septic system can continue to be used until it either fails or is rendered <br /> nonconforming by future septic regulations. <br /> The sewer connection fee is currentiv $6,500 and w711 be adjusted for inflation on an annual basis. <br /> This connection fee can either be paid before connection to the sewer system or be assessed over a <br /> 15-year time period at a 6.25% annual interest rate. A signed assessment waiver�tizll be required if <br /> you request to be assessed for the connection fee. <br /> In addition to the connection fee,there is a one time SAC fee of$1,275. This SAC fee increases on <br /> an annual basis and is payment for the additional costs of the future downstream capacity in the <br /> Metropolitan Council Sewer System. <br /> This pressure sewer system requires that each propert�- owner install and maintain their own <br /> individual grinder pump station. A"progressive caviri�"grinder pump will be required,and the City <br /> needs to approve the pump that will be installed to ensure compatibility with the se«-er system. The <br /> estimated property owner costs for the grinder pump station, service connection, and septic tank <br /> abandonment can range from$7,000 to $12,000 dependin� on the length of the service connection <br /> required. The City's current flat rate user charge for residzntial sewer is approYimately $90.00 per <br /> quarter. <br /> Page 1 <br /> Telephone(952)249-4600 • Fax(952)249-461b <br /> www.ci.orono.mn.us <br />