My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-P06031 - demo
Orono
>
Property Files
>
Street Address
>
R
>
Ruann Road
>
250 Ruann Road - 36-118-23-32-0002
>
Permits/Inspections
>
2003-P06031 - demo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:02:34 PM
Creation date
7/25/2018 11:21:59 AM
Metadata
Fields
Template:
x Address Old
House Number
250
Street Name
Ruann
Street Type
Road
Address
250 Ruann Road
Document Type
Permits/Inspections
PIN
3611823320002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� CITY OF ORONO APPLICATION FOR DEMOLITION PERMIT <br /> P.O. Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, MN 55323 � <br /> ' SPECIAL CONDITIONS & HOLD HARMLESS AGREEMENT <br /> General Instructions <br /> 1. You may be required to obtain other permits, i.e. well abandonmment, etc, <br /> 2. Work must not begin unless the permit card is available on the job site. <br /> 3. A 24 hour notice is required for all inspections. Call (612) 249-4600. <br /> JOB SITE ADDRESS: a�j U ��e.�,n ��� <br /> Occupancy Type: � Residential Commercial <br /> OWNER'S NAME: �-.��,�.1� L , C�a,,.,� �es:g^�'�ione: °15 a -43S -Srti ra <br /> Mailing Address: 5 5o d L;,.�o�n D F. City� Ed�„�d m N. <br /> �b 5�15-355 <br /> CONTRACTOR'SNAME: KG,,;-�k Excawa+��, Z„t. Bus.No.: �3�,��N���y�_ <br /> Mailing Address: 3 3 3 5 .Pe�,�S��,,s,,;� 4„�. N. CitY�___s.���1 <br /> Demolition if planned by means of: manual disassembly <br /> _�heavy equipment <br /> Permits Issued: <br /> # Well Abandonment <br /> In return for issuance of said Demolition Permit,the undersigned owner hereby agrees as follows: <br /> 1. The structure(s) shall be kept enclosed and/or secured until such time as demolition is <br /> complete. <br /> 2. Demolition debris will be kept off adjoining property and/or the public rights-of-way unless <br /> specific prior approval is obtained in writing for temporary use thereof. <br /> 3. Foundations shall be completely removed from the ground. <br /> 4. All demolition debris shall be completely disposed of off site in accordance with all <br /> applicable PCA requirements. <br /> 5. Water wells must be abandoned in accordance with State Health Department regulations. <br /> 6. Inspection required when all debris has been removed, before backfilling. <br />
The URL can be used to link to this page
Your browser does not support the video tag.