My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-01170 - gas fireplace
Orono
>
Property Files
>
Street Address
>
R
>
Rest Point Road
>
1410 Rest Point Road - 07-117-23-33-0001
>
Permits/Inspections
>
2010-01170 - gas fireplace
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:36:18 PM
Creation date
7/25/2018 10:09:16 AM
Metadata
Fields
Template:
x Address Old
House Number
1410
Street Name
Rest Point
Street Type
Road
Address
1410 Rest Point Rd
Document Type
Permits/Inspections
PIN
0711723330001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. `+ <br /> • GROUT: Grout may be compoaed of mortar retemQered with water. <br /> JOINTS: All joints exposed to the weather ah�ll be tooled. All � <br /> joints within the firebox sha11 not e�cceed 1/4". <br /> CONSTRUCTION: When the bricks are being 1sid, they shall be <br /> sufficiently damp, and the mortar sufficiently soft, <br /> so that the mortar will remain plastic to permit the <br /> units to be leveled and plumbed imanediately after <br /> being laid without losing bond. All rnasonry work <br /> shall be accurately executed and in conformity with <br /> the plans. No brick less than 1/2 length shall be <br /> used in exposed work. Head and bed joints shall be <br /> solidly filled with mortar and brick shall be shoved <br /> into place. <br /> Fireplaces are generally of two types. One type is <br /> constructed on concrete slab floors and the other type <br /> is constructed in a frame floor using a cantilevered <br /> hearth. <br /> The generally accepted method of construction of a <br /> fireplace from the hearth up is as follows : the <br /> fireplace is laid out • the back of the fireplace is <br /> constructed to a scaffold height approximate2y five <br /> feet; and then the firebox is constructed and backfilled <br /> with te�pered mortar. Do not grout solidly behind firebox <br /> wall to allow for expansion of firebox. <br /> Some fireboxes are eonstructed without the face, leaving <br /> ties so the face may be added at a later date, while <br /> other fireboxes are constructed simultaneously with <br /> the face. Either way is an approved method of <br /> construction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.