My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-P11414 - demolition of principal structure
Orono
>
Property Files
>
Street Address
>
R
>
Rest Point Road
>
1374 Rest Point Road - 07-117-23-33-0012
>
Permits/Inspections
>
2007-P11414 - demolition of principal structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:36:39 PM
Creation date
7/23/2018 9:29:10 AM
Metadata
Fields
Template:
x Address Old
House Number
1374
Street Name
Rest Point
Street Type
Road
Address
1374 Rest Point Rd
Document Type
Permits/Inspections
PIN
0711723330012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> y 2. Demolition debris will be kept off adjoining property and/or the public rights-of way unless <br /> specific prior approval is obtained in writing for temporary use thereof. <br /> 3. Foundations shall be completely removed from the ground. <br /> 4. All demolition debris shall be completely disposed of off site in accordance with all <br /> applicable PCA requirements. <br /> 5. Water wells must be abandoned in accordance with State Health Department regulations. <br /> 6. Inspection required when all debris has been removed, before backfilling. <br /> 7. Within 5 working days of superstructure removal, a final inspection shall be requested. The <br /> site shall be lett clean and clear of all debris, with any excavation filled with earth level with <br /> the adjacent ground elevation (except when such excavation is to be used as part of a new <br /> building and such new building is actually under construction). <br /> 8. Septic systems must be abandoned per Minnesota Rules Chapter 7080. A(I septic tanks <br /> must be pumped, crushed and filled with native soils. An inspection is required after the <br /> tanks are pumped and before the tanks are crushed and filled. <br /> 9. The undersigned owne►- shall and hereby does indemnify and hold harmless the City of <br /> Orono, its agents, employees and assigns firom and against all claims, damages, losses or <br /> expenses, including attorney fees, against the City, its agents, employees and assigns arising <br /> out of or resulting from the demolition described herein as performed by the property owner, <br /> his employees, agents, subcontractors or assigns. <br /> PERMIT TYPE AND F'EE CALCULATION <br /> �✓ $50.00— Principal Structure <br /> � $30.00—Accessory Structure (how many) (what) <br /> 1. Subtotal ofi above permit requested $ 50.00 <br /> 2. State Surcharge $ .50 <br /> 3. TOTAL PERMIT FEE�(add lines 1-2 above) $ 50.50 <br /> The undersigned herby applies to the City of Orono for issuance of a Demolition Permit, agrees <br /> to do all the work in a strict accordance with the ordinances of the City and the regulations of <br /> the State of Minnesota, and certifies that all st�tements made on this application are complete, <br /> true and correct. <br /> �, � � � C <br /> Applicant's Signature: , � Date: � <br /> `� �.�� c _ <br /> � _ �'�- <br /> Owner's Signature� � Date: <br /> T— <br /> Approved By: _ Date: `7-�� -�� <br /> (Building Official) <br /> x Zoning Disclosure Required? ❑ YES NO �,������-4'�����j ���'�^.�{1i�`�� f�G�� <br /> *This must be filled out by Zonin Department—For eith nswer, Zoning Official must ign all applications. ���� <br /> ) �� � <br /> X Approved By: � �— �" v�� Date: �') � � ���' � ��� '�� `�" <br /> (Z ning�i ' I) <br /> Reset Form <br />
The URL can be used to link to this page
Your browser does not support the video tag.