My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-P11375 - demo
Orono
>
Property Files
>
Street Address
>
R
>
Rest Point Circle
>
1350 Rest Point Circle - 07-117-23-31-0024
>
Permits/Inspections
>
2007-P11375 - demo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:34:21 PM
Creation date
7/18/2018 11:15:13 AM
Metadata
Fields
Template:
x Address Old
House Number
1350
Street Name
Rest Point
Street Type
Circle
Address
1350 Rest Point Cir
Document Type
Permits/Inspections
PIN
0711723310024
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> � <br /> • 2. Demolition debris will be kept off adjoining property and/or the public rights-of way unless <br /> specific prior approval is obtained in writing for temporary use thereof. <br /> : 3. Foundations shall be completely removed from the ground. <br /> 4. All demolition debris shall be completely disposed of off site in accordance wit�i all <br /> applicable PCA requirements. <br /> 5. Water wells must be abandoned in accordance with State Health Department regulations. <br /> 6. Inspection required when all debris has been removed,before backfilling. <br /> 7. Within 5 working days of superstructure removal, a final inspection shall be requested. The <br /> site shall be left clean and clear of all debris,with any excavation filled with earth level with <br /> the adjacent graund elevation(except when such excavation is to be used as part of a new <br /> building and such new building is actually under construction). <br /> 8. Septic systems must be abandoned per Minnesota Rules Chapter 7080. All septic tanks <br /> must be pumped, crushed and filled with native soils. An inspection is required after the <br /> tanks are pumped and before the tanks are crushed and filled. <br /> 9. The undersigned owner shall and hereby does indemnify and hold harmless the City of <br /> Orono, its agents, employees and assigns from and against all claims, damages, losses or <br /> expenses, including attorney fees, against the City, its agents, employees and assigns arising <br /> out of or resulting from the demolition described herein as performed by the property owner, <br /> his employees, agents, subcontractors or assigns. <br /> PERMIT TYPE AND FEE CALCULATION <br /> ,�$50.00—Principal Structure <br /> � $30.00—Accessory Structure � (how many) C/ ,r�}.q,Qi (what) <br /> 1. Subtotal of above permit requested $ <br /> 2. State Surcharge $ .50 <br /> 3. TOTAL PERMIT FEE (add lines 1-2 above) $ <br /> The undersigned herby applies to the City of Orono for issuance of a Demolirion Permit, agrees <br /> to do all the work in a strict accordance with the ordinances of the City and the regulations of <br /> the State of Minnesota, and certifies that all statements made on this application are complete, <br /> true and correct. <br /> Applicant's Sig�ature: � � �'`-- Date: � 2� �� <br /> Owner's Signat�re: � l �Date: �S a-c� D <br /> Approved By: Date: '27 '6Z <br /> Bui ding Official) <br /> * Zoning Disclosure Required? [�YES ❑ NO <br /> *This must be filled out by Zoning Depa — either answer,a Zoning Official must sign all applications. <br /> * Approved By: Date: 8 U <br /> oning Official) <br /> fb <br />
The URL can be used to link to this page
Your browser does not support the video tag.