Laserfiche WebLink
RES�heck Saftware Version 4.1.� <br /> Inspection Checklist <br /> Date: 08/21/07 <br /> Ceilings: <br /> � Ceiling 1:Flat Ceiling or Scissor Truss,R�0.0 cavity insulation <br /> Comrrients: <br /> Above-Grade Walls: <br /> i._1 Wall 1:Insulated Concrete Forms,R-22.0 assembly R-value <br /> Comments: <br /> ❑ Wall 2:Wood Frame,16"o.c.,R-19.0 cavity insutatio� <br /> Comments: <br /> Basement Walls: <br /> ❑ Basement Wall 1:Insulated Concrete Fortns,9.0'ht/8.6'bg/9.0'insul,R-22.0 assembly R-value <br /> Comments: <br /> Exterior insulation has a rigid,opaque,weather-resistant protective covering that covers the exposed(above-grade)insulation and <br /> extends at least 6 in.below grade. <br /> Windows: <br /> ❑ Window 1:Wood Frame:Dauble Pane with Low-E,U-factor:0.400 <br /> For windows without labeled U-factors,describe features: <br /> #Panes Frame Type Thermal Break? Yes_No <br /> Comments: <br /> Doors: <br /> L] Door 1:Glass,U-factor:0.340 <br /> Comments: <br /> ❑ Door 2:Solid,U-factor:0.350 <br /> Comments: <br /> Floors: <br /> J Floor 1:All-Wood JoisUTruss:Over Unconditioned Space,R-38.0 cavity insulation <br /> Comments: <br /> Air Leakage: <br /> ;� Joints,penetrations,and all other such openings in the building envelope that are sources of air leakage are sealed. <br /> � Recessed lights are 1)Type IC rated,or 2)installed inside an appropriate air-tight assembly with a 0.5"clearance from <br /> combustible materials.If non-IC rated,fixtures are i�stalled with a 3"clearar�ce from insulation. <br /> Vapor Retarder: <br /> �� Installed on the warm-in-winter side of all non-vented framed ceilings,walls,and floors. <br /> Materials Identification: <br /> � Materials and equipment are installed in accordance with ttte manufacturers installation instructions. <br /> � Materials and equipment are identified so that compliance can be determined. <br /> � Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment have been provided. <br /> � lnsulation R-values and glazing U-factors are clearly marked on the building plans or specifications. <br /> u Insulation is installed according to manufacturer's instructions,in substantial contact with the surface being insulated,and in a <br /> manner that achieves the rated R-value without campressing the insulation. <br /> Orono-1350-07 Page 2 of 4 <br />